MO6RFP090 | The TRIUMF/VECC Collaboration on a 10 MeV/30 kW Electron Injector | 577 |
|
||
TRIUMF (Canada) and VECC (India) are planning to each build a 1.3GHz 50MeV/500kW superconducting electron linac as a driver for producing radioactive ion beams through photo-fission. The two institutes have launched a collaboration with the initial goal to design, build and test a 5-10MeV superconducting injector cryomodule capable of accelerating up to 10mA. A testing area is being set-up at TRIUMF to house the electron gun, rf buncher, injector cryomodule, diagnostic station and beam-dump for beam studies. The project will test all critical elements of the final linac; beam halo generation, HOM excitation, LLRF and rf beam loading and cavity and cryomodule design/performance. The scope and status of the project will be described. |
||
WE2GRC03 | Acceleration of Charge Bred Radioactive Ions at TRIUMF | 1869 |
|
||
Most ion sources at ISOL (isotope separation on-line) facilities can produce only singly charged ions but efficient post acceleration requires high charge states. For light ions this can be achieved by stripping after a first moderate acceleration but with heavy ions this is no longer possible and charge state breeding is necessary. The breeder should be able to work at a high efficiency for the required charge state and especially for short-lived radioactive isotopes the process should be fast. For the ISAC facility at TRIUMF an ECRIS charge breeder (14 GHz PHOENIX from Pantechnik) has been chosen as it is well adapted to the continuous mode operation of the accelerator and for radioactive ions there is practically no limit for the beam intensity. After off-line optimization on a test bench the source has been moved on-line to the ISAC facility. Mass separated beams of radioactive ions from the on-line ion sources can be directed into the source. During a first test in fall 2008 a beam of 80Rb14+ was successfully created from 80Rb1+ and accelerated by the ISAC post accelerator. A summary of the results from the test bench and from the on-line commissioning will be presented. |
||
|
||
WE4PBC04 | An Electron Linac Photo-Fission Driver for the Rare Isotope Program at TRIUMF | 1958 |
|
||
A 0.5 megawatt electron linear accelerator is being designed at TRIUMF in support of its expanding rare isotope program, which targets nuclear structure and astrophysics studies as well as material science. The first stage of the project, a 25 MeV, 5 mA, cw linac matching the isotope production target power-handling capability in the next five-year plan, is planned to be completed in 2013. The injector cryomodule development, which is being fast tracked, is the subject of a scientific collaboration between TRIUMF and the VECC laboratory in Kolkata, India. The paper gives an overview of the accelerator design progress. |
||
|
||
FR5REP124 | Beam Delivery and Future Initiatives at the ISAC Radioactive Ion Beam Facility | 5074 |
|
||
The ISAC facility, located at TRIUMF, first began delivering radioactive ion beams (RIBs) in 1998, added post-accelerated beam capability in 2001, and is regarded as one of the premiere RIB facilities in the world. The existing constraints on RIBs of Z<83 and accelerated beams of A/q<30 with energies limited to 5MeV/u are being addressed. A charge-state booster for RIBs has been commissioned to alleviate the A/q<30 restriction and has successfully delivered multi-charge beams through the ISAC accelerators. The 5MeV/u license limit will be removed once an on-line beam monitor is commissioned, allowing beams of up to 11MeV/u to be delivered presently, and increased to over 20MeV/u when the next accelerator phase is installed. In 2008, an actinide target was used to produce RIBs of Z>82; this successful test was performed on a uranium target with yields measured and radiation safety monitored. A new Beam Delivery group has been formed to integrate all aspects of RIB production, which has led to improved efficiency and greater experimental results. These new capabilities will be presented, showing how 2009 promises to be both an exciting and productive year at ISAC. |