A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Akai, K.

Paper Title Page
MO3RAI01 A Few Issues on the Upgrade of KEKB B-Factory 23
 
  • K. Oide, T. Abe, K. Akai, Y. Funakoshi, T. Kageyama, H. Koiso, K. Ohmi, Y. Ohnishi, K. Shibata, Y. Suetsugu, M. Tobiyama
    KEK, Ibaraki
 
 

A few issues on the path of the luminosity upgrade of KEKB B-Factory is described, including coherent synchrotron radiation, design of the interaction region, crab crossing, and high current operation. These issues will raise more obstacles on the upgrade with the High-Current Scheme. As an alternative, {¥it Nano-Beam Scheme} should be considered as a possible option for the upgrade.

 

slides icon

Slides

 
WE6PFP043 Recent Progress of KEKB 2588
 
  • Y. Funakoshi, T. Abe, K. Akai, Y. Cai, K. Ebihara, K. Egawa, A. Enomoto, J.W. Flanagan, H. Fukuma, K. Furukawa, T. Furuya, J. Haba, T. Ieiri, N. Iida, H. Ikeda, T. Kageyama, S. Kamada, T. Kamitani, S. Kato, M. Kikuchi, E. Kikutani, H. Koiso, M. Masuzawa, T. Mimashi, T. Miura, A. Morita, T.T. Nakamura, K. Nakanishi, M. Nishiwaki, Y. Ogawa, K. Ohmi, Y. Ohnishi, N. Ohuchi, K. Oide, M. Ono, Y. Seimiya, K. Shibata, M. Suetake, Y. Suetsugu, T. Sugimura, T. Suwada, M. Tawada, M. Tejima, M. Tobiyama, N. Tokuda, S. Uehara, S. Uno, Y. Yamamoto, Y. Yano, K. Yokoyama, M. Yoshida, S.I. Yoshimoto, D.M. Zhou
    KEK, Ibaraki
 
 

Crab cavities were installed at KEKB at the beginning of 2007. The beam operation with the crab cavities is in progress. In this paper, machine performance with crab crossing is described focusing on a specific luminosity and a beam lifetime issue related to the dynamic beam-beam effects.

 
WE6PFP046 Variations in Beam Phase and Related Issues Observed in KEKB 2595
 
  • T. Ieiri, K. Akai, M. Tawada, M. Tobiyama
    KEK, Ibaraki
 
 

KEKB is a multi-bunch, high-current electron-positron collider. Newly installed crab cavities realized an effective head-on collision, while maintaining finite-angle crossing orbits. Bunches form a single train followed by a beam abort gap. We observed a beam phase advancing along a train due to transient beam loading. Since there is a difference in the beam phase between the two beams, a longitudinal displacement of the collision vertex is expected under the crabbing collision. Estimated variations agree with those detected by the Belle*. A displacement in the horizontal beam position was observed in correspondence with the variations in the beam phase. We found that the horizontal displacement was caused by a transverse kick of the crab cavities to phase-shifted bunches. Moreover, a rapid phase advancing was observed at the leading part in a train in the LER. We suspect that some longitudinal wakes with low Q values in accelerator components might contribute to the rapid change in the beam phase.


*H. Kichimi et al., to be published.