Paper | Title | Page |
---|---|---|
THPLB07 | Experience with a 4-Rod CW Radio Frequency Quadrupole | 825 |
|
||
Since 1991 the High Charge State Injector (HLI) provides heavy ion beams for the linear accelerator UNILAC at GSI*. It is equipped with an ECR ion source and an RFQ-IH linac which accelerates highly charged ion beams with high duty factor of up to 30% to 1.4 MeV/u for further acceleration in the Alvarez DTL of the UNILAC. Main user of these beams is the Super Heavy Element (SHE) research, one of the outstanding projects at GSI**. Experiments like TASCA and SHIP strongly benefit from the high average beam intensities. After two decades of successful operation the four-rod Radio Frequency Quadrupole (RFQ) accelerator was replaced in 2010 by a newly designed RFQ of the same type**. Besides higher beam transmission, the principal intention of this upgrade was to raise the duty factor up to 100%, since the HLI is foreseen as injector for the upcoming cw linac dedicated to the SHE program**. Commissioning and operational experience from the first years revealed that this goal could not be reached easily. In this paper we present the RFQ design, commissioning results, operational experience and future activities.
* N. Angert et al., EPAC92, Berlin, Germany (1992), p. 167 ** L. Dahl et al., LINAC10, Tsukuba, Japan (2010), MOP042, and references therein |
||
![]() |
Slides THPLB07 [0.986 MB] | |
THPB035 | Experience with a 4-Rod CW Radio Frequency Quadrupole | 930 |
|
||
Since 1991 the High Charge State Injector (HLI) provides heavy ion beams for the linear accelerator UNILAC at GSI*. It is equipped with an ECR ion source and an RFQ-IH linac which accelerates highly charged ion beams with high duty factor of up to 30% to 1.4 MeV/u for further acceleration in the Alvarez DTL of the UNILAC. Main user of these beams is the Super Heavy Element (SHE) research, one of the outstanding projects at GSI**. Experiments like TASCA and SHIP strongly benefit from the high average beam intensities. After two decades of successful operation the four-rod Radio Frequency Quadrupole (RFQ) accelerator was replaced in 2010 by a newly designed RFQ of the same type**. Besides higher beam transmission, the principal intention of this upgrade was to raise the duty factor up to 100%, since the HLI is foreseen as injector for the upcoming cw linac dedicated to the SHE program**. Commissioning and operational experience from the first years revealed that this goal could not be reached easily. In this paper we present the RFQ design, commissioning results, operational experience and future activities.
* N. Angert et al., EPAC92, Berlin, Germany (1992), p. 167 ** L. Dahl et al., LINAC10, Tsukuba, Japan (2010), MOP042, and references therein |
||