TUP023 | CH-Cavity Development for the 17 MeV EUROTRANS Injector | 446 |
|
||
Recent international cw operated high-current applications with ambitious requirements regarding beam power and quality ask for new linear accelerator developments. In this context the CH-structure (Crossbar-H-mode) has been developed at the Institute for Applied Physics (IAP) of Frankfurt University. It is a multi-cell drift tube cavity for the low and medium energy range operated in the H21-mode and can be used for superconducting as well as for room temperature applications. Because of the large energy gain per cavity, which leads to high real estate gradients, the CH-cavity is an excellent candidate for the efficient acceleration in high power proton and ion accelerators with fixed velocity profiles. One possible application for this kind of cavity is the EUROpean research programme for the TRANSmutation (EUROTRANS) of high level nuclear waste in an accelerator driven system (ADS), which requires an efficient high-current cw-linac (600 MeV, 4 mA, protons, 352 MHz). The paper describes the status of the CH-cavity development and the actual beam dynamics results for the reference design of the 17 MeV EUROTRANS injector. |
||
TUP041 | The New GSI HLI-RFQ for CW-Operation | 494 |
|
||
A new CW-RFQ has been built for the upgrade of the HLI (High Charge State Injector) of GSI for operating with a 28GHz-ECR-Ion source and simultaneous increase of the beam duty cycle from 25 % now to 100 %. The new HLI 4-rod RFQ will accelerate charged ions from 4 keV/u to 300 keV/u for the injection into the IH-structure. High beam transmission, a small energy spread and small transverse emittance growth and good input matching are design goals. Properties of this CW-RFQ, status of project and first measurements will be presented. |
||
TUP034 | Beam Commissioning Results for the RFQ and MEBT of the EBIS Based Preinjector for RHIC | 473 |
|
||
The EBIS based preinjector for the RHIC is now being commissioned. During the step-wise commissioning of the preinjector from January 2009 to June 2010, the RFQ was commissioned first using Test EBIS in January 2009 and then moved to its final location and commissioned again with RHIC EBIS in March 2010. The RFQ accelerates ions from 17 keV/u to 300 keV/u and operates at 100.625 MHz. The RFQ is followed by a short (81 cm) Medium Energy Beam Transport (MEBT), which consists of four quadrupoles and one buncher cavity. Temporary diagnostics for this commissioning included an emittance probe, TOF system, fast Faraday cup, and beam current measurement units. This contribution will report results of RFQ and MEBT commissioning with helium and gold beams. |