A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Trowitzsch, G.

Paper Title Page
MOP081 The PITZ CDS Booster Cavity RF Tuning and Start of Conditioning 241
 
  • V.V. Paramonov, A. Naboka
    RAS/INR, Moscow
  • A. Donat, L. Jachmann, W. Köhler, M. Krasilnikov, J. Meissner, D. Melkumyan, M. Otevrel, B. Petrosyan, J. Schultze, F. Stephan, G. Trowitzsch, R.W. Wenndorff
    DESY Zeuthen, Zeuthen
  • K. Flöttmann
    DESY, Hamburg
  • D. Richter
    HZB, Berlin
 
 

The DESY PITZ booster cavity, based on the Cut Disk Structure (CDS), is completed in construction. The L-band normal conducting cavity is intended to operate with accelerating rate up to 12.5 MV/m and RF pulse length up to 800 mks to increase the electron bunch energy in the PITZ facility at 20 MeV. The cavity was vacuum conditioned to reduce the out-gassing rate for operation in the facility with photo cathodes. The cavity is mounted in the PITZ tunnel and RF conditioning is started. The results of RF tuning before and after cavity brazing, together with first results of conditioning, are presented.

 
TUP011 Layout of the PITZ Transverse Deflecting System for Longitudinal Phase Space and Slice Emittance Measurements 416
 
  • L.V. Kravchuk, V.V. Paramonov
    RAS/INR, Moscow
  • A. Anisimov, M.V. Lalayan, A.Yu. Smirnov, N.P. Sobenin
    MEPhI, Moscow
  • D. Churanov, E.V. Ivanov, S.V. Kutsaev, M. Urbant, A.A. Zavadtsev, D.A. Zavadtsev
    Nano, Moscow
  • A. Donat, W. Köhler, M. Krasilnikov, J. Meissner, M. Pohl, J. Schultze, F. Stephan, G. Trowitzsch, R.W. Wenndorff
    DESY Zeuthen, Zeuthen
  • C. Gerth, M. Hoffmann, M. Hüning
    DESY, Hamburg
 
 

Transverse Deflecting Systems are designated for longitudinal beam diagnostics of ultra-short electron bunches in modern FEL projects. At the European XFEL, Transverse Deflecting Systems are foreseen at three locations. A prototype of the TDS in the injector of the European XFEL will be installed at PITZ which is identical in terms of deflecting structure, low-level RF system and powerful RF hardware. This PITZ TDS has the aim to prove the required performance for all TDS subsystems as well as serve as a diagnostics tool for PITZ. Results of the test cells measurements of a S-band travelling wave structure are presented, showing very good agreement with calculated parameters. RF power supply system, including 3 MW klystron and other RF hardware, is described. Solid state 130 kV Marx modulator has been developed for the klystron feeding. 10 kV module of the modulator has been built and tested. The modulator allows for high voltage shutdown within pulse.