A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Toge, N.

Paper Title Page
MO302 S1-Global Collaborative Efforts - 8-Cavity-Cryomodule: 2 FNAL, 2 DESY and 4 KEK 31
 
  • N. Ohuchi, M. Akemoto, S. Fukuda, H. Hayano, N. Higashi, E. Kako, H. Katagiri, Y. Kojima, Y. Kondou, T. Matsumoto, H. Matsushita, S. Michizono, T. Miura, H. Nakai, H. Nakajima, S. Noguchi, M. Satoh, T. Shidara, T. Shishido, T. Takenaka, A. Terashima, N. Toge, K. Tsuchiya, K. Watanabe, S. Yamaguchi, A. Yamamoto, Y. Yamamoto, K. Yokoya, M. Yoshida
    KEK, Ibaraki
  • C. Adolphsen, C.D. Nantista
    SLAC, Menlo Park, California
  • T.T. Arkan, S. Barbanotti, H. Carter, M.S. Champion, R.D. Kephart, J.S. Kerby, D.V. Mitchell, Y. Orlov, T.J. Peterson, M.C. Ross
    Fermilab, Batavia
  • A. Bosotti, C. Pagani, R. Paparella, P. Pierini
    INFN/LASA, Segrate (MI)
  • D. Kostin, L. Lilje, A. Matheisen, W.-D. Möller, N.J. Walker, H. Weise
    DESY, Hamburg
 
 

In an attempt at demonstrating an average field gradient of 31.5 MV/m as per the design accelerating gradient for ILC, a program called S1-Global is in progress as an international research collaboration among KEK, INFN, FNAL, DESY and SLAC. The design of the S1-G cryomodule began at May 2008 by INFN and KEK. The S1-Global cryomodule was designed to contain eight superconducting cavities from FNAL, DESY and KEK, and to be constructed by joining two half-size cryomodules, each 6 m in length. The module containing four cavities from FNAL and DESY was constructed by INFN. Four KEK cavities have been assembled in the 6 m module which KEK fabricated. All major components were transported to KEK from INFN, FNAL and DESY in December 2009. The assembly of the two 6-m cryomodules started from January 2010 in a collaborative work of FNAL, DESY, INFN and KEK. The construction of the S1-G cryomodule will complete in May, and the cool-down of the S1-G cryomodule is scheduled from June 2010 at the KEK-STF. In this paper, the construction and the cold tests of the S1-Global cryomodule in the worldwide research collaboration will be presented.

 

slides icon

Slides

 
THP120 First Test Result of the IHEP-01 Large Grain 9-Cell Cavity 1022
 
  • J. Gao, J.P. Dai, Z.D. Guo, M. Hou, Z.Q. Li, L.L. Men, Q.Y. Wang, Q. Xiao, J.Y. Zhai
    IHEP Beijing, Beijing
  • H. Hayano, E. Kako, S. Noguchi, M. Sawabe, T. Shishido, N. Toge, K. Watanabe, Y. Yamamoto
    KEK, Ibaraki
  • T.X. Zhao
    IHEP Beiing, Beijing
 
 

The combination of the low-loss shape and large grain niobium material is expected to be the possible way to achieve higher gradient and lower cost for ILC 9-cell cavities. As the key component of the 'IHEP 1.3 GHz SRF Accelerating Unit and Horizontal Test Stand Project', a low-loss shape 9-cell cavity using Ningxia large grain niobium (IHEP-01) was fabricated and surface treated (CBP, CP, annealing, pre-tuning) at IHEP. Then the cavity was shipped to KEK STF for ultrasonic cleaning, high pressure rinsing, baking and vertical test. The cavity reached 20 MV/m in the first vertical test on July 1st 2010. The quench location has been found by T-mapping and optical inspection. The strong field emission and equator defects will be removed by further treatment. The fabrication procedure, surface treatment recipes and the first test results are summarized in this paper.