Plostinar, D.C.

Paper Title Page
MOP080 Design Optimisation of the Re-bunching Cavities for the Front End Test Stand at RAL 238
 
  • D.C. Plostinar
    STFC/RAL/ASTeC, Chilton, Didcot, Oxon
  • R. Enparantza, M. Larrañaga
    Fundación TEKNIKER, Eibar (Gipuzkoa)
 
 

The Medium Energy Beam Transport (MEBT) line for the Front End Test Stand (FETS) at Rutherford Appleton Laboratory (RAL) will transport a 60 mA, 2ms, 50 pps H- beam at 3 MeV. Its main components include a number of quadrupoles, re-bunching cavities and a fast-slow chopping system with dedicated beam dumps, as well as a diagnostics beam line. In this paper we present the design approach for the MEBT re-bunching cavities. A description is given for the proposed geometry and the main design choices are examined. In addition, the latest RF simulations results performed with 2D and 3D electromagnetic codes are presented including optimisation details and manufacturing plans.

 
TUP028 Status of the FETS Commissioning and Comparison with Particle Tracking Results 461
 
  • J.K. Pozimski, R.D. Howard, S. Jolly
    Imperial College of Science and Technology, Department of Physics, London
  • J.J. Back
    University of Warwick, Coventry
  • M.A. Clarke-Gayther, D.C. Faircloth, S.R. Lawrie, A.P. Letchford
    STFC/RAL/ISIS, Chilton, Didcot, Oxon
  • D.C. Plostinar
    STFC/RAL/ASTeC, Chilton, Didcot, Oxon
 
 

In order to contribute to the development of high power proton accelerators in the MW range, to prepare the way for an ISIS upgrade and to contribute to the UK design effort on neutrino factories, a front end test stand (FETS) is being constructed at the Rutherford Appleton Laboratory (RAL) in the UK. The aim of the FETS is to demonstrate the production of a 60 mA, 2 ms, 50 pps chopped beam at 3 MeV with sufficient beam quality. The status of the FETS will be given and experimental results from the commissioning of LEBT and ion source will be presented. Previous measurements showed that the emittance of the beam delivered by the ion source exceeded our expectations by more than a factor of 3. Since then various changes in the beam extraction/post accelerator region reduced the beam emittance more than a factor of 2. The results from measurements will be compared with numerical simulations of the particle dynamics from the ion source to the end of the MEBT and the results discussed in respect to further work.