MOP022 Tuning of CLIC Accelerating Structure Prototypes at CERN 97
 
  • A. Grudiev, A. Olyunin, J. Shi, W. Wuensch
    CERN, Geneva
 
 

An RF measurement system has been set up at CERN for use in the X-band accelerating structure development program of the CLIC study. Using the system, S-parameters are measured and the field distribution is obtained automatically by using a bead-pull technique. The corrections for tuning the structure are calculated from the result. Integrated software guides cell-by-cell tuning to obtain the correct phase advance and minimum reflection at the operation frequency. The detailed configuration of the system, as well as the semi-automatic tuning procedure, is presented along with a few examples of measurement and tuning of CLIC accelerating structure prototypes.