A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Molloy, S.

Paper Title Page
MOP019 CLIC Ring to Main Linac 88
 
  • F. Stulle, D. Schulte, J. Snuverink
    CERN, Geneva
  • A. Latina
    Fermilab, Batavia
  • S. Molloy
    Royal Holloway, University of London, Surrey
 
 

The low emittance transport had been identified as one of the feasibility issues for CLIC. We discuss beam dynamics challenges occurring in the beam lines of the RTML connecting the damping rings and the main linac. And we outline how these motivate design choices for the general RTML layout as well as its integration into the overall CLIC layout. Constraints originating from longitudinal dynamics and stabilization requirements of beam energy and phase at the main linac entrance are emphasized.