A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Joly, C.

Paper Title Page
MOP082 Low Level Radio-frequency Developments toward a Fault-tolerant Linac Scheme for an Accelerator Driven System 244
 
  • F.B. Bouly, J.-L. Biarrotte, C. Joly
    IPN, Orsay
 
 

An Accelerator Driven System (ADS) for transmutation of nuclear waste requires a high power proton beam (several MWs) to reach the necessary spallation efficiency. Due to the induced thermal stress to the subcritical core, the high-power proton linac will have to fulfil stringent reliability requirements to minimise the number of unwanted beam trips (> 1 sec.) per operation cycle. In view of the construction of the MYRRHA ADS demonstrator, in Mol (Belgium), beam dynamic analyses were carried out to evaluate the fault tolerant capability of the superconducting linac, in the particular case of a radiofrequency (RF) cavity failure. This analysis was coupled with simulations on the RF behaviour of 700 MHz superconducting cavitiy as well as its tuning and feedback loop systems. Such considerations led to the development of a prototypical digital Low Level RF (LLRF) system to control the cavity phase and accelerating field, especially in the case of fast cavity retuning for failure compensation. In this paper we summarize the work which has been performed so far toward the development of such a fault-tolerant RF linac.

 
THP023 Developments and Test of a 700 MHz Prototypical Cryomodule for the MYRRHA ADS Proton Linear Accelerator 809
 
  • F.B. Bouly, J.-L. Biarrotte, S. Bousson, C. Commeaux, C. Joly, J. Lesrel
    IPN, Orsay
  • A. Bosotti, P.M. Michelato, R. Paparella, P. Pierini, D. Sertore
    INFN/LASA, Segrate (MI)
 
 

Accelerator Driven systems (ADS) are being considered for their potential use in the transmutation of nuclear waste. Because of the induced thermal stress to the subcritical core, the high-power proton LINAC will have to fulfill stringent reliability requirements and to minimize the number of unwanted beam trips per operation cycle. It is forseen to build an ADS demonstrator (MYRRHA) in Mol (Belgium). Such a device will be piloted by a 600 MeV / 4mA superconducting linac. IPN Orsay and INFN Milano are in charge of the realisation and tests of a prototypical cryomodule for the high energy section of the accelerator, equipped with a 5-cell superconducting cavity. Developed at INFN, this RF cryogenic accelerating device is tested for the first time at IPN. We will describe the status of the R&D activities on this device. The first low power tests of the 5-cell superconducting cavity in its prototypical cryomodule will be reviewed. Those tests aim to evaluate the cavity performances after installation in the module (16MV/m in vertical test) but also to measure the tuning systems behaviors in view of reliability considerations for 'fast fault-recovery scenarios'.