A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Hocker, A.

Paper Title Page
THP029 Operating Experience with CC2 at Fermilab's SRF Beam Test Facility 818
 
  • E.R. Harms, J. Branlard, G.I. Cancelo, K. Carlson, B. Chase, E. Cullerton, A. Hocker, P.W. Joireman, T. Kubicki, J.R. Leibfritz, A. Martinez, M.W. McGee, Y.M. Pischalnikov, J. Reid, W. Schappert, K.R. Treptow, V. Tupikov, P. Varghese, T.J. Zmuda
    Fermilab, Batavia
 
 

Capture Cavity II is the first operational component at the SRF Beam Test Facility now under construction at Fermilab. This 9-cell 1.3 GHz cavity, previously operated in another venue on the Fermilab site, was transported to this facility in early 2009. We will summarize its transport and operation in its new (permanent) home compared to previous performance and also present results of studies, particularly Low Level RF, microphonics/vibration, and Lorentz force de-tuning compensation that have been recently carried out with it.