Paper | Title | Page |
---|---|---|
MOP064 | R&D of C Band Accelerating Structure at SINAP | 199 |
|
||
A compact hard X-ray FEL facility is on plan now at Shanghai Institute of Applied Physics (SINAP). This facility will be located close to Shanghai Synchrotron Radiation Facility(SSRF) which is a 3rd generation light source in China, in order to control the overall length less than 650m, this facility asks a compact linac with high gradient accelerating structure. C-band (5712MHz) accelerating structure is a compromised and good option for this compact facility. R&D of a C-band (5712MHz) high gradient traveling-wave accelerating structure has been in progress at Shanghai Institute of Applied Physics (SINAP). The structure is consisted of 53 regular disk-loaded cells and two waveguide couplers, and its length is about one meter. This paper introduces the study of the accelerating structure design method, its experimental model and the preliminary results of the RF cold test of the model structure. |