MO202 | Operating Experience of the 20 MV Upgrade Linac | 21 |
|
||
The ISAC-II Phase II expansion includes the addition of 20 new quarter wave resonators in three cryomodules to double the energy gain of the ISAC-II superconducting linac. The rf cavities are produced in Canada. The talk will concentrate on the beam commissioning (scheduled for March 2010) and early operating experience. |
||
TH202 | VECC/TRIUMF Injector for the e-Linac Project | 727 |
|
||
TRIUMF (Canada) and VECC (India) are both planning to use the photo-fission route for producing neutron-rich radioactive ion beams in their respective RIB programmes. With this common goal the two institutes have entered into a collaboration to jointly design and develop a superconducting 1.3GHz 50MeV, 10 mA, CW electron linac which will be used as the fission driver. The first phase of the e-Linac collaboration aims at the development, production and full technical and beam test of a 10MeV injector cryo module (ICM) which forms the front-end of the final linac. The design and technical development of the ICM will be presented. |