MO302 S1-Global Collaborative Efforts - 8-Cavity-Cryomodule: 2 FNAL, 2 DESY and 4 KEK 31
 
  • N. Ohuchi, M. Akemoto, S. Fukuda, H. Hayano, N. Higashi, E. Kako, H. Katagiri, Y. Kojima, Y. Kondou, T. Matsumoto, H. Matsushita, S. Michizono, T. Miura, H. Nakai, H. Nakajima, S. Noguchi, M. Satoh, T. Shidara, T. Shishido, T. Takenaka, A. Terashima, N. Toge, K. Tsuchiya, K. Watanabe, S. Yamaguchi, A. Yamamoto, Y. Yamamoto, K. Yokoya, M. Yoshida
    KEK, Ibaraki
  • C. Adolphsen, C.D. Nantista
    SLAC, Menlo Park, California
  • T.T. Arkan, S. Barbanotti, H. Carter, M.S. Champion, R.D. Kephart, J.S. Kerby, D.V. Mitchell, Y. Orlov, T.J. Peterson, M.C. Ross
    Fermilab, Batavia
  • A. Bosotti, C. Pagani, R. Paparella, P. Pierini
    INFN/LASA, Segrate (MI)
  • D. Kostin, L. Lilje, A. Matheisen, W.-D. Möller, N.J. Walker, H. Weise
    DESY, Hamburg
 
 

In an attempt at demonstrating an average field gradient of 31.5 MV/m as per the design accelerating gradient for ILC, a program called S1-Global is in progress as an international research collaboration among KEK, INFN, FNAL, DESY and SLAC. The design of the S1-G cryomodule began at May 2008 by INFN and KEK. The S1-Global cryomodule was designed to contain eight superconducting cavities from FNAL, DESY and KEK, and to be constructed by joining two half-size cryomodules, each 6 m in length. The module containing four cavities from FNAL and DESY was constructed by INFN. Four KEK cavities have been assembled in the 6 m module which KEK fabricated. All major components were transported to KEK from INFN, FNAL and DESY in December 2009. The assembly of the two 6-m cryomodules started from January 2010 in a collaborative work of FNAL, DESY, INFN and KEK. The construction of the S1-G cryomodule will complete in May, and the cool-down of the S1-G cryomodule is scheduled from June 2010 at the KEK-STF. In this paper, the construction and the cold tests of the S1-Global cryomodule in the worldwide research collaboration will be presented.

 

slides icon

Slides

 
TUP081 Superconducting RF Cryomodule Production and Testing at Fermilab 599
 
  • T.T. Arkan, H. Carter, M.S. Champion, E.R. Harms, R.D. Kephart, J.R. Leibfritz
    Fermilab, Batavia
 
 

Fermilab has produced two cryomodules for superconducting RF (SRF) applications to date. The first of these is an ILC prototype containing eight 1.3 GHz Tesla-type cavities and a superconducting quadrupole. This cryomodule is of the 'Type 3+' design developed by the TESLA collaboration. The assembly of this cryomodule was accomplished at Fermilab with much assistance from DESY and INFN-Milano. The cryomodule was tested at Fermilab in the summer of 2010. The second cryomodule produced at Fermilab contains four 3.9 GHz nine-cell cavities. The cavities and cryomodule were designed at Fermilab; the design concepts are quite similar to the 1.3 GHz Type 3+ cryomodule. This cryomodule was shipped to DESY, tested, and is now operating as part of a third-harmonic system in the FLASH facility. Fermilab plans to build five more 1.3 GHz cryomodules over the next several years for a total of six, which will be installed and operated in the New Muon Lab beam test facility at Fermilab.

 
THP026 Superconducting RF Cavity Production Processing and Testing at Fermilab 815
 
  • C.M. Ginsburg, M.S. Champion, J.P. Ozelis, A.M. Rowe
    Fermilab, Batavia
  • M.P. Kelly
    ANL, Argonne
 
 

The superconducting RF (SRF) cavity production program at Fermilab supports 9-cell 1.3 GHz cavity qualification and preparation for assembling cavities into cryomodules, in support of Project X, ILC, or other future projects. Cavity qualification includes cavity inspection, surface processing, clean assembly, and one or more cryogenic qualification tests which typically include performance diagnostics. The overall goals of the program, facilities and accomplishments are described.