Paper | Title | Page |
---|---|---|
TUP026 | Low and Medium Energy Beam Trasport Upgrade at BNL 200 MeV Linac | 455 |
|
||
BNL 200 MeV linac has been under operation since 1970 and gone through several changes during its 40 year lifetime. The latest reconfiguration in low and medium energy (35 and 750 keV) beam transport lines results in about a factor of 2 reduction in the transverse emittance for the accelerated polarized proton beam, and for the unpolarized high current H- beam a several fold reduction in the radiation levels due to beam losses throughout the linac and isotope production facility complex with more beam current on the isotope production target. These improvements are achieved by proper matching into the linac in longitudinal as well as transverse phase space. This paper will emphasize how longitudinal matching resulted in lower emittance and beam losses. |
||
TUP033 | Commissioning of the IH Linac and High Energy Beam Transport of the EBIS Based Preinjector for RHIC | 470 |
|
||
The EBIS based preinjector for RHIC is now being commissioned. The Linac was delivered in April 2010 and commissioning started in May, 2010. It accelerates ions from 0.3 MeV/u to 2 MeV/u with 27 accelerating gaps, one internal quadrupole triplet, and operates at 100.625 MHz. The Linac is followed by a beam transport line to Booster which includes seven quadrupoles, two bunchers, and an achromatic bend system with resolution of 500 at 2 MeV/u to select the required charge state. Diagnostics include a pepperpot emittance probe, phase probes , fast Faraday cup, adjustable slits, three sets of multiwire profile monitors, three current transformers, two Faraday cups, and two beam stops. This contribution will report results of linac tuning and cold measurements, and commissioning of the Linac and high energy transport line with helium and gold beams. |
||
TUP034 | Beam Commissioning Results for the RFQ and MEBT of the EBIS Based Preinjector for RHIC | 473 |
|
||
The EBIS based preinjector for the RHIC is now being commissioned. During the step-wise commissioning of the preinjector from January 2009 to June 2010, the RFQ was commissioned first using Test EBIS in January 2009 and then moved to its final location and commissioned again with RHIC EBIS in March 2010. The RFQ accelerates ions from 17 keV/u to 300 keV/u and operates at 100.625 MHz. The RFQ is followed by a short (81 cm) Medium Energy Beam Transport (MEBT), which consists of four quadrupoles and one buncher cavity. Temporary diagnostics for this commissioning included an emittance probe, TOF system, fast Faraday cup, and beam current measurement units. This contribution will report results of RFQ and MEBT commissioning with helium and gold beams. |
||
FR103 | Commissioning of the EBIS-Based Heavy Ion Preinjector at Brookhaven | 1033 |
|
||
This talk will present commissioning of a new heavy ion pre-injector at Brookhaven National Laboratory. This preinjector uses an Electron Beam Ion Source (EBIS), and an RFQ and IH Linac, both operating at 100.625 MHz, to produce 2 MeV/u ions of any species for use, after further acceleration, at the Relativistic Heavy Ion Collider, and the NASA Space Radiation Laboratory. Among the increased capabilities provided by this preinjector are the ability to produce ions of any species, and the ability to switch between multiple species in 1 second, to simultaneously meet the needs of both physics programs. |
||
|