Paper | Title | Page |
---|---|---|
TUPRI069 | NSLS-II Commissioning with 500 MHZ 7-CELL PETRA-III Cavity | 1724 |
|
||
The NSLS-II storage ring has been commissioned during Phase 1 with 500 MHz 7-cell PETRA-III RF cavity. In this paper we present our first beam-measured data on instabilities and collective effects with a normal conducting RF system. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2014-TUPRI069 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |