Paper |
Title |
Page |
TUPRO095 |
Using One-dimensional Hall Probe to Measure the Solenoid Magnet for CSNS/RCS |
1262 |
|
- Z. Zhang, S. Li, F. Long, X.J. Sun
IHEP, Beijing, People's Republic of China
|
|
|
Abstract CSNS(China Spallation Neutron Source) construction is expected to start in 2010 and will last 6.5 years. A long beam transport line is followed with the DTL linac to send the beam a rapid cycling synchrotron (RCS) accelerator. The beam will be focused by the solenoid magnet. This magnet will be located in LEBT system. It has been used with one-dimensional Hall probe to measurement by Institute of High Energy Physics, China. After the measurement, the measurement results meet the design requirements.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2014-TUPRO095
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|