Paper |
Title |
Page |
WEOCA03 |
DAΦNE Operation with the Upgraded KLOE-2 Detector |
1883 |
|
- C. Milardi, D. Alesini, M.E. Biagini, M. Boscolo, B. Buonomo, S. Cantarella, A. De Santis, G.O. Delle Monache, G. Di Pirro, A. Drago, L.G. Foggetta, O. Frasciello, A. Gallo, A. Ghigo, F. Guatieri, S. Guiducci, F. Iungo, C. Ligi, G. Mazzitelli, L. Pellegrino, R. Ricci, U. Rotundo, C. Sanelli, G. Sensolini, M. Serio, A. Stecchi, A. Stella, M. Zobov
INFN/LNF, Frascati (Roma), Italy
- R. Gargana, A. Michelotti
Consorzio Laboratorio Nicola Cabibbo, Frascati, Italy
- D.N. Shatilov
BINP SB RAS, Novosibirsk, Russia
- M. Tobiyama
KEK, Ibaraki, Japan
- A. Valishev
Fermilab, Batavia, Illinois, USA
|
|
|
The DAΦNE collider has been successfully commissioned after the experimental detector modification and a major upgrade and consolidation program involving a large part of the accelerator complex. This paper presents the Φ-Factory setup and the achieved performances in terms of beam currents, luminosity, detector background and related aspects.
|
|
|
Slides WEOCA03 [2.424 MB]
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2014-WEOCA03
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
THPRI002 |
DAΦNE General Consolidation and Upgrade |
3760 |
|
- C. Milardi, D. Alesini, S. Bini, B. Buonomo, S. Cantarella, A. De Santis, G.O. Delle Monache, G. Di Pirro, A. Drago, L.G. Foggetta, O. Frasciello, A. Gallo, A. Ghigo, F. Iungo, C. Ligi, L. Pellegrino, R. Ricci, U. Rotundo, C. Sanelli, G. Sensolini, A. Stecchi, A. Stella, M. Zobov
INFN/LNF, Frascati (Roma), Italy
- R. Gargana, A. Michelotti
Consorzio Laboratorio Nicola Cabibbo, Frascati, Italy
|
|
|
In the first six months of 2013 the KLOE detector has been upgraded inserting new detector layers in the inner part of the apparatus, around the interaction region. The long shutdown has been used to undertake a general consolidation program aimed at improving the Φ-Factory operation stability and reliability and, in turn, the collider uptime. In this context several systems have been revised and upgraded, new diagnostic elements have been installed, some critical components have been modified and the interaction region mechanical support structure design has been developed to improve its mechanical stability and to deal with the weight added by the new detector layers.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2014-THPRI002
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
THPRI015 |
DAΦNE Transfer Line for KLOE-2 Physics Run |
3797 |
|
- A. De Santis, B. Buonomo, S. Cantarella, P. Ciuffetti, G. Di Pirro, A. Drago, L.G. Foggetta, A. Ghigo, C. Milardi, R. Ricci, U. Rotundo, M. Serio, A. Stecchi, A. Stella
INFN/LNF, Frascati (Roma), Italy
- A. Michelotti
Consorzio Laboratorio Nicola Cabibbo, Frascati, Italy
|
|
|
The transfer lines of the DAΦNE accelerator complex have been revised and optimized in view of the forthcoming KLOE-2 physics run. The transfer lines consolidation activities involved low level systems, diagnostics tools and control system hardware modifications for the magnetic element switching polarity during the injection procedure. Transfer lines optics has been reviewed and optimized as well by a systematic study based on a MAD-X model. The work done determined a substantial improvement in the transfer lines stability and reproducibility, speeded up the injection procedure with a considerable reduction on the background hitting the experimental detector during the beam injection process.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2014-THPRI015
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|