Status of the FAIR Synchrotron Projects SIS18 Upgrade and SIS100 |
1857 |
|
- P.J. Spiller, R. Balß, A. Bleile, L.H.J. Bozyk, J. Ceballos Velasco, T. Eisel, E.S. Fischer, P. Forck, P. Hülsmann, M. Kauschke, O.K. Kester, H. Klingbeil, H.G. König, H. Kollmus, P. Kowina, A. Krämer, J.P. Meier, A. Mierau, C. Omet, D. Ondreka, N. Pyka, H. Ramakers, P. Schnizer, H. Welker, St. Wilfert
GSI, Darmstadt, Germany
- A. Iluk
WRUT, Wrocław, Poland
- H.G. Khodzhibagiyan
JINR, Dubna, Moscow Region, Russia
- D. Urner
FAIR, Darmstadt, Germany
|
|
|
The upgrade of the existing heavy ion synchrotron SIS18 as booster for the FAIR synchrotron SIS100 has been partly completed. With the achieved technical status, a major increase of the accelerated number of heavy ions could be reached. This progress especially demonstrates the feasibilty of acceleration of medium charge state heavy ions with high intensity and and the succesfull control of dynamic vaccuum effects and correlated charge exchange loss. Two further upgrade measures, the installation of additional MA acceleration cavities and the exchange of the main dipole power converter are in progress. For the FAIR synchrotron SIS100 all major components with long production times have been ordered. With several pre-series components, outstanding technical developments have been completed and the readiness for series production reached. The technical project status will be summarized.
|
|
|
Slides WEOBA01 [6.107 MB]
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2014-WEOBA01
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
THPME058 |
Risk Analysis and Machine Protection of SIS100 |
3364 |
|
- C. Omet, M.S. Mandakovic, D. Ondreka, P.J. Spiller, J. Stadlmann
GSI, Darmstadt, Germany
|
|
|
To ensure safe functionality and reduce unneccessary shutdowns, a risk analysis of the main driver accelerator for the FAIR project SIS100, has been done. The analysis includes all major technical systems and was done accordingly to EN 61508. Results of the analysis and appropriate countermeasures for detection and/or mitigation of the failures are presented. Furthermore, an estimation of the accelerator‘s availability is given.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2014-THPME058
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|