Paper | Title | Page |
---|---|---|
WEPRI051 | Results from RF Tests of the First US-built High-gradient Superconducting Cryomodule | 2598 |
|
||
Funding: United States Department of Energy, Contract No. DE-AC02-07CH11359 Fermilab has built a cryomodule comprised of eight 1.3 GHz superconducting RF cavities for use in its Advanced Superconducting Test Accelerator (ASTA) facility. This cryomodule (RFCA002) was intended to achieve the International Linear Collider (ILC) “S1” goal of demonstrating an average accelerating gradient of 31.5 MV/m, and is the first of its kind built in the United States. The module has been cooled down and operated without beam at ASTA in order to assess its performance. The results from these tests are presented here. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2014-WEPRI051 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |