Status of the FAIR Synchrotron Projects SIS18 Upgrade and SIS100 |
1857 |
|
- P.J. Spiller, R. Balß, A. Bleile, L.H.J. Bozyk, J. Ceballos Velasco, T. Eisel, E.S. Fischer, P. Forck, P. Hülsmann, M. Kauschke, O.K. Kester, H. Klingbeil, H.G. König, H. Kollmus, P. Kowina, A. Krämer, J.P. Meier, A. Mierau, C. Omet, D. Ondreka, N. Pyka, H. Ramakers, P. Schnizer, H. Welker, St. Wilfert
GSI, Darmstadt, Germany
- A. Iluk
WRUT, Wrocław, Poland
- H.G. Khodzhibagiyan
JINR, Dubna, Moscow Region, Russia
- D. Urner
FAIR, Darmstadt, Germany
|
|
|
The upgrade of the existing heavy ion synchrotron SIS18 as booster for the FAIR synchrotron SIS100 has been partly completed. With the achieved technical status, a major increase of the accelerated number of heavy ions could be reached. This progress especially demonstrates the feasibilty of acceleration of medium charge state heavy ions with high intensity and and the succesfull control of dynamic vaccuum effects and correlated charge exchange loss. Two further upgrade measures, the installation of additional MA acceleration cavities and the exchange of the main dipole power converter are in progress. For the FAIR synchrotron SIS100 all major components with long production times have been ordered. With several pre-series components, outstanding technical developments have been completed and the readiness for series production reached. The technical project status will be summarized.
|
|
|
Slides WEOBA01 [6.107 MB]
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2014-WEOBA01
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
THPME100 |
The Mechanical Design of the BPM Inter-tank Section for P-linac at FAIR |
3474 |
|
- M.H. Almalki, R. M. Brodhage, P. Forck, W. Kaufmann, O.K. Kester, P. Kowina, T. Sieber
GSI, Darmstadt, Germany
- M.H. Almalki, R. M. Brodhage, O.K. Kester
IAP, Frankfurt am Main, Germany
- M.H. Almalki
KACST, Riyadh, Kingdom of Saudi Arabia
- J. Balaguer
CEA/IRFU, Gif-sur-Yvette, France
- P. Girardot, C.S. Simon
CEA/DSM/IRFU, France
|
|
|
At the planned Proton LINAC at the FAIR facility, four-fold button Beam Position Monitor (BPM) will be installed at 14 locations along the 30 m long FAIR p-LINAC. The LINAC comprises of crossbar H-mode (CH) cavity to accelerate a 70 mA proton beam up to 70 MeV at frequency of 325 MHz. At four locations, the BPMs will be an integral part of the inter-tank section between the CCH and CH cavities within an evacuated housing. As the BPM centre is only 48 mm apart from the upstream cavity boundary, the rf-background at the BPM position, generated by the cavity must be evaluated. In this paper the mechanical design of the BPM for the inter-tank section is presented and the rf-noise at the BPM location is discussed.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2014-THPME100
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|