Paper | Title | Page |
---|---|---|
TUPRI070 | Analysis of Coupled-bunch Instabilities in the NSLS-II Storage Ring | 1727 |
|
||
We discuss coupled-bunch instabilities thresholds for the NSLS-II Storage Ring. In particular, we analyze thresholds from the High Order Modes (HOMs) of the PETRA-III 7-cell cavity. Beam dynamics simulations with the code OASIS, using the measured HOMs, will be compared with machine studies. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2014-TUPRI070 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
WEPRO018 | Theoretical Maximum Current of the NSLS-II Linac | 1980 |
|
||
Funding: This manuscript has been authored by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy. An analysis of the maximum available NSLS-II linac current was performed as part of the preparation for NSLS-II Booster commissioning. The analysis was necessary in order to establish the maximum beam current available from the linac and the maximum current that would be available to the booster accelerator. In this paper we discuss the assumptions that were used in determining the maximum linac current, the model of the linac and comparison to operational conditions. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2014-WEPRO018 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |