WEPRO079 | Accelerator Systems Modifications for a Second Target Station at the Oak Ridge Spallation Neutron Source | 2140 |
|
||
Funding: ORNL/SNS is managed by UT-Battelle, LLC, for the U.S. Department of Energy under contract DE-AC05-00OR22725. A second target station is planned for the Oak Ridge Spallation Neutron Source. The ion source will be upgraded to increase the peak current from 38 to 49 mA, additional superconducting RF cavities will be added to the linac to increase the H− beam energy from 933 to 1300 MeV, and the accumulator ring will receive modifications to the injection and extraction systems to accommodate the higher beam energy. After pulse compression in the storage ring one sixth of the beam pulses (10 out of 60 Hz) will be diverted to the second target by kicker and septum magnets added to the existing Ring to Target Beam Transport (RTBT) line. No further modifications will be made to the RTBT so that when the kicker and septum magnets are turned off the original target 1 beam transport lattice will be unaffected. In this paper we will discuss these and other planned modifications and upgrades to the accelerator facility, and also the status of this project. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2014-WEPRO079 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |