Paper |
Title |
Page |
TUPRI008 |
Target System Concept for a Muon Collider/Neutrino Factory |
1568 |
|
- K.T. McDonald
PU, Princeton, New Jersey, USA
- X.P. Ding
UCLA, Los Angeles, California, USA
- V.B. Graves
ORNL, Oak Ridge, Tennessee, USA
- H.G. Kirk, H. K. Sayed, D. Stratakis
BNL, Upton, Long Island, New York, USA
- N. Souchlas, R.J. Weggel
Particle Beam Lasers, Inc., Northridge, California, USA
|
|
|
A concept is presented for a Target System in a staged scenario for a Neutrino Factory and eventual Muon Collider, with emphasis on initial operation with a 6.75 GeV proton beam of 1 MW power, and 50 Hz of pulses 3-ns long. A radiation cooled graphite target will be used in the initial configuration, with an option to replace this with a free-liquid-metal-jet target should 4-MW beam power become available at a later stage.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2014-TUPRI008
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
THPRI089 |
Carbon Target Optimization for a Muon Collier/neutrino Factory With a 6.75 GeV Proton Driver |
3982 |
|
- X.P. Ding
UCLA, Los Angeles, California, USA
- H.G. Kirk
BNL, Upton, Long Island, New York, USA
- K.T. McDonald
PU, Princeton, New Jersey, USA
|
|
|
The first phase of a Muon Collider/Neutrino Factory program may use a 6.75-GeV proton driver with beam power of only 1 MW. At this lower power it is favorable to use a graphite target (replaced quarterly) with beam and target tilted slightly to the axis of the 15-20 T pion-capture solenoid around the target. The low-energy proton beam is significantly deflected by the magnetic field, requiring careful optimization, reported here, of the beam/target configuration.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2014-THPRI089
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|