Paper | Title | Page |
---|---|---|
WEPRI058 | Commissioning Status of the Advanced Superconducting Test Accelerator at Fermilab | 2615 |
|
||
Funding: *Operated by Fermi Research Alliance, LLC under Contract No. DE-AC02-07CH11359 with the United States Department of Energy. The Advanced Superconducting Test Accelerator (ASTA) is under construction at Fermilab. This accelerator will consist of a photo-electron gun, injector, ILC-type cryomodules, and multiple downstream beam-lines. Its purpose is to be a user-based facility for Advanced Accelerator R&D. . Following the successful commissioning of the photoinjector gun, a Tesla style 8-cavity cryomodule and a high gradient capture cavity have been cooled down to 2 K and powered commissioning and performance characterization has begun. We will report on the commissioning status and near-term future plans for the facility. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2014-WEPRI058 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |