The Joint Accelerator Conferences Website (JACoW) is an international collaboration that publishes the proceedings of accelerator conferences held around the world.
TY - CONF AU - Honda, T. AU - Adachi, M. AU - Asaoka, S. AU - Haga, K. AU - Harada, K. AU - Honda, Y. AU - Izawa, M. AU - Kageyama, T. AU - Kamiya, Y. AU - Kobayashi, Y. AU - Marutsuka, K. AU - Miyajima, T. AU - Miyauchi, H. AU - Nagahashi, S. AU - Nakamura, N. AU - Nogami, T. AU - Obina, T. AU - Ono, M. AU - Ozaki, T. AU - Sagehashi, H. AU - Sakai, H. AU - Sakanaka, S. AU - Sasaki, H. AU - Sato, Y. AU - Shimada, M. AU - Shinoe, K. AU - Shioya, T. AU - Tadano, M. AU - Tahara, T. AU - Takahashi, T. AU - Takai, R. AU - Takaki, H. AU - Tanimoto, Y. AU - Tsuchiya, K. AU - Uchiyama, T. AU - Ueda, A. AU - Umemori, K. AU - Watanabe, K. AU - Yamamoto, M. AU - Yoshida, Ma. AU - Yoshimoto, S.I. ED - Petit-Jean-Genaz, Christine ED - Arduini, Gianluigi ED - Michel, Peter ED - Schaa, Volker RW TI - Recent Development and Operational Status of PF-Ring and PF-AR J2 - Proc. of IPAC2014, Dresden, Germany, June 15-20, 2014 C1 - Dresden, Germany T2 - International Particle Accelerator Conference T3 - 5 LA - english AB - Update of the first-generation undulators installed in 1980s is pushed forward at PF-Ring, a 2.5-GeV SR source of KEK, taking advantage of the expanded straight sections reconstructed in 2005. New undulators have been designed as elliptically polarizing undulators each has 6 magnetic arrays to obtain various polarization states, not only circular polarization but also linear (horizontal and vertical) polarization. Three undulators will be installed in FY2013 and FY2014 for BL02, BL13 and BL28. For BL02, the longest straight section of about 9 m, the new undulator will be installed in tandem with the existing planar undulator, in order to cover the wide photon energy range from 15 eV to 2 keV. At PF-AR, a 6.5-GeV SR source, a new direct beam transport (BT) line from the injector LINAC is under construction. Super KEKB which shares the injector LINAC with PF-Ring and PF-AR will be commissioned at the end of FY2014. The full-energy continuous injection of PF-AR will be available as a simultaneous injection with the 7-GeV HER, the 4-GeV LER and PF-Ring not so later than the commissioning of Super KEKB. PB - JACoW CP - Geneva, Switzerland SP - 286 EP - 288 KW - undulator KW - vacuum KW - injection KW - photon KW - operation DA - 2014/07 PY - 2014 SN - 978-3-95450-132-8 DO - 10.18429/JACoW-IPAC2014-MOPRO084 UR - http://jacow.org/ipac2014/papers/mopro084.pdf ER -