MOPEA046 Solaris Project Progress 181
 
  • A.I. Wawrzyniak, C.J. Bocchetta, P.B. Borowiec, D. Einfeld, P.P. Goryl, M. Młynarczyk, R. Nietubyć, M.P. Nowak, W. Soroka, M.J. Stankiewicz, P. Szostak, P.S. Tracz, Ł. Walczak, K. Wawrzyniak, J.J. Wiechecki, M. Zając, Ł. Żytniak
    Solaris, Kraków, Poland
  • D. Einfeld
    MAX-lab, Lund, Sweden
  • R. Nietubyć
    NCBJ, Świerk/Otwock, Poland
 
  Funding: Work supported by the European Regional Development Fund within the frame of the Innovative Economy Operational Program:POIG.02.01.00-12-213/09
So­laris is a 3rd gen­er­a­tion light source fa­cil­ity being built in Kraków, Poland at the Jagiel­lon­ian Uni­ver­sity Cam­pus. The pro­ject is being ac­com­plished in a tight col­lab­o­ra­tion with the MAX IV Lab­o­ra­tory in Lund, Swe­den. The So­laris 1.5 GeV stor­age ring is a replica of the MAX IV 1.5 GeV ma­chine, whereas the in­jec­tor and the trans­fer line al­though based on the same com­po­nents, are unique for So­laris. One of the main dif­fer­ences is the 600 MeV in­jec­tion en­ergy re­quir­ing an en­ergy ramp in the stor­age ring to the final op­er­at­ing en­ergy of 1.5 GeV. The con­struc­tion of the fa­cil­ity started in early 2010 and is planned to be fin­ished in the au­tumn 2014. Up to now, 70% of the com­po­nents have been pro­cured and con­struc­tion of the build­ings in progress with ex­pected han­dover in au­tumn 2013. This paper will give an up­date on in­fra­struc­ture progress and de­sign choices for shield­ing, ser­vice area place­ment of racks and rout­ing of pip­ing and ca­bles. An up­date is also pre­sented of ma­chine lay­out that in­cludes the in­jec­tor, trans­fer line and stor­age ring.