Author: Xing, Q.Z.
Paper Title Page
THPWO049 Preliminary Beam Dynamics and Structure Design of One 50mA/CW RFQ with Ramped Inter-vane Voltage 3881
 
  • L. Du, X. Guan, C.-X. Tang, Q.Z. Xing
    TUB, Beijing, People's Republic of China
 
  Funding: Work supported by National Natural Scienccontracte Foundation of China (Major Research Plan Grant No. 91126003 and Project 11175096).
The beam dy­nam­ics and struc­ture de­sign of a ramped-volt­age CW RFQ (Radio Fre­quency Quadru­pole) ac­cel­er­a­tor for a NSFC (Na­tional Nat­ural Sci­ence Foun­da­tion of China) Pro­ject at Ts­inghua Uni­ver­sity is pre­sented in this paper. The ramped-volt­age RFQ, in which the in­ter-vane volt­age in­creases from the low-en­ergy end to the high-en­ergy end, is com­pact and ef­fi­cient. The RFQ, with the op­er­at­ing fre­quency of 325 MHz, will cap­ture a 50 mA/CW, 50 keV pro­ton beam from the RF source and ac­cel­er­ate it to 3 MeV, an en­ergy suit­able for chop­ping and in­ject­ing the beam in a con­ven­tional Drift Tube Linac. After op­ti­miza­tion, the total length is as short as 2.9 m and the trans­mis­sion rate is above 97%. The de­sign of RFQ struc­ture in­clud­ing the un­der­cuts will also be shown.
 
 
THPWO050 High Power Test and Beam Commissioning of he CPHS RFQ Accelerator 3884
 
  • Q.Z. Xing, C. Cheng, L. Du, Q. Du, T. Du, C. Jiang, H.T. Lu, J. Ni, Q. Qiang, C.-X. Tang, X.W. Wang, Y.G. Yang, H.Y. Zhang, S.X. Zheng
    TUB, Beijing, People's Republic of China
  • J.H. Billen
    Self Employment, Private address, USA
  • W.Q. Guan, Y. He, J. Li
    NUCTECH, Beijing, People's Republic of China
  • X. Guan
    Tsinghua University, Beijing, People's Republic of China
  • J. Stovall
    STFC/RAL, Chilton, Didcot, Oxon, United Kingdom
  • L.M. Young
    LMY Technology, USA
 
  Funding: Work supported by the “985 Project” of the Ministry of Education of China, National Natural Science Foundation of China (Major Research Plan Grant No. 91126003 and 11175096).
We pre­sent, in this paper, the high power test re­sult and the beam com­mis­sion­ing sta­tus of a Radio Fre­quency Quadru­pole (RFQ) ac­cel­er­a­tor for the Com­pact Pulsed Hadron Source (CPHS) at Ts­inghua Uni­ver­sity. The 3-me­ter-long RFQ is de­signed to de­liver 3 MeV pro­tons to the down­stream High En­ergy Beam Trans­port (HEBT) with the peak cur­rent of 50 mA, pulse length of 0.5 ms and beam duty fac­tor of 2.5%. The RFQ has been de­signed, man­u­fac­tured, and in­stalled at Ts­inghua Uni­ver­sity. High-vac­uum test of the RFQ has been car­ried out care­fully and the cool­ing sys­tem has been mounted. At the be­gin­ning of 2013, the high power RF test has been per­formed and the first 3 MeV pro­ton beam is ob­tained.