Author: Muttoni, Y.
Paper Title Page
WEPEA041 Actions To Mitigate The Radiation Damage to Electronics at the LHC 2591
 
  • A.-L. Perrot, M.B.M. Barberan Marin, J.-P. Corso, K. Foraz, M. Lazzaroni, Y. Muttoni
    CERN, Geneva, Switzerland
 
  The level of flux of hadrons with en­ergy in the multi MeV range ex­pected from the col­li­sions at the LHC in­ter­ac­tion Points 1, 5 and 8 and from the col­li­ma­tion sys­tem at Point 7 will in­duce Sin­gle Event Er­rors (SEEs) in the stan­dard elec­tron­ics pre­sent in many of the con­trol equip­ment in­stalled in LHC un­der­ground. Fur­ther­more, a risk of SEEs in­duced by ther­mal neu­trons can­not be ex­cluded. Such events would per­turb the LHC op­er­a­tion, pos­si­bly lead­ing to a stop of the ma­chine. Main mit­i­ga­tion ac­tions will be im­ple­mented dur­ing the first LHC Long Shut­down of 2013/2014 (LS1) to re­duce the SEE oc­cur­rence. This paper sum­ma­rizes the mit­i­ga­tion mea­sures and their as­so­ci­ated fore­seen im­prove­ments in terms of SEEs. It pre­sents the or­ga­ni­za­tion process and as­so­ci­ated plan­ning high­light­ing the im­pacts with the over­all LHC LS1 plan­ning and the main con­cerns dur­ing im­ple­men­ta­tion.  
 
THPWO078 Status of the Upgrade of the CERN PS Booster 3939
 
  • K. Hanke, O. Aberle, M. E. Angoletta, W. Bartmann, S. Bartolome, E. Benedetto, C. Bertone, A. Blas, P. Bonnal, J. Borburgh, D. Bozzini, A.C. Butterworth, C. Carli, E. Carlier, J.R.T. Cole, P. Dahlen, M. Delonca, T. Dobers, A. Findlay, R. Froeschl, J. Hansen, D. Hay, S. Jensen, J.-M. Lacroix, P. Le Roux, L.A. Lopez Hernandez, C. Maglioni, A. Masi, G.W. Mason, S.J. Mathot, B. Mikulec, Y. Muttoni, A. Newborough, D. Nisbet, S. Olek, M.M. Paoluzzi, A. Perillo-Marcone, S. Pittet, B. Puccio, V. Raginel, B. Riffaud, I. Ruehl, A. Sarrió Martínez, J. Tan, B. Todd, V. Venturi, W.J.M. Weterings
    CERN, Geneva, Switzerland
 
  The CERN PS Booster (PSB) is presently un­der­go­ing an am­bi­tious con­sol­i­da­tion and up­grade pro­gram within the frame of the LHC In­jec­tors Up­grade (LIU) pro­ject. This pro­gram com­prises a new in­jec­tion scheme for H ions from CERN’s new Linac4, the re­place­ment of the main RF sys­tems and an en­ergy up­grade of the PSB rings from 1.4 to 2.0 GeV which in­cludes the re­place­ment of the main mag­net power sup­ply as well as the up­grade of the ex­trac­tion equip­ment. This paper de­scribes the sta­tus and plans of this work pro­gram.