Author: Meddahi, M.
Paper Title Page
MOPFI053 Upgrades of the SPS, Transfer Line and LHC Injection Protection Devices for the HL-LHC Era 401
 
  • Ö. Mete, O. Aberle, F. Cerutti, K. Cornelis, B. Goddard, V. Kain, R. Losito, F.L. Maciariello, M. Meddahi, A. Mereghetti, J.A. Uythoven, F.M. Velotti
    CERN, Geneva, Switzerland
  • E. Gianfelice-Wendt
    Fermilab, Batavia, USA
 
  The challenging High Luminosity LHC (HL-LHC) beam requirements will lead in the future to unprecedented beam parameters along the LHC injector chain. In the SPS accelerator these requests translate into about a factor two higher intensity and brightness than the present design performance. In addition to the challenge of producing and accelerating such beams, these parameters affect the resistance of the existing equipment against beam impact. Most of the protection devices in the SPS ring, its transfer lines and the LHC injection areas will be put under operational constraints which are beyond their design specification. The equipment concerned has been reviewed and their resistance to the HL-LHC beams checked. Theoretical and simulation studies have been performed for the SPS beam scraping system, the protection devices and the dump absorbers of the SPS-to-LHC transfer lines, as well as for the LHC injection protection devices. The first results of these studies are reported, together with the future prospects.  
 
MOPFI060 Beam Transfer to LHC with the Low Gamma-transition SPS Optics 419
 
  • G. Vanbavinckhove, W. Bartmann, H. Bartosik, C. Bracco, L.N. Drøsdal, B. Goddard, V. Kain, M. Meddahi, V. Mertens, Y. Papaphilippou, J.A. Uythoven, J. Wenninger
    CERN, Geneva, Switzerland
  • E. Gianfelice-Wendt
    Fermilab, Batavia, USA
 
  A new low gamma-transition optics with a lower integer tune, was introduced in the SPS to improve beam stability at high intensity. For transferring the beam to the LHC, the extraction bumps, extraction kickers and transfer lines needed to be adapted to the new optics. In particular, the transfer lines were re-matched and re-commissioned with the new optics. The first operational results are discussed for the SPS extraction, the transfer lines and the LHC injection. A detailed comparison is presented between the old and the new optics of the trajectories, dispersion, losses and other performance aspects.  
 
MOPWO032 SPS Scraping and LHC Transverse Tails 957
 
  • L.N. Drøsdal, K. Cornelis, B. Goddard, V. Kain, M. Meddahi, Ö. Mete, B. Salvachua, G. Valentino, E. Veyrunes
    CERN, Geneva, Switzerland
 
  All high-intensity LHC beams have to be scraped before extraction from the SPS to remove the non-Gaussian transverse tails of the particle distributions. The tail particles would otherwise cause unacceptably high losses during injection or other phases of the LHC cycle. Studies have been carried out to quantify the scraping using injection losses and emittance measurements from wire scanners as diagnostics. Beams scraped in the SPS were scraped again in the LHC with collimators to investigate possible tail repopulation. The results of these studies will be presented in this paper.  
 
MOPWO034 Energy Deposition Studies for the Upgrade of the LHC Injection Lines 963
 
  • A. Mereghetti, O. Aberle, F. Cerutti, B. Goddard, V. Kain, F.L. Maciariello, M. Meddahi
    CERN, Geneva, Switzerland
  • R. Appleby
    UMAN, Manchester, United Kingdom
  • E. Gianfelice-Wendt
    Fermilab, Batavia, USA
 
  The LHC Injectors Upgrade (LIU) Project aims at upgrading the systems in the LHC injection chain, to reliably deliver the beams required by the High-Luminosity LHC (HL-LHC). Given the challenging beam intensities and emittances, a review of the existing beam-intercepting devices is on-going, in order to assess heat loads and consequent thermo-mechanical stresses. Moreover, the exposure of downstream elements to induced shower radiation is assessed. The study is intended to spot possible issues and contribute to the definition of viable design and layout solutions.  
 
TUPEA051 Beam Transfer Line Design for a Plasma Wakefield Acceleration Experiment (AWAKE) at the CERN SPS 1247
 
  • C. Bracco, J. Bauche, D. Brethoux, V. Clerc, B. Goddard, E. Gschwendtner, L.K. Jensen, A. Kosmicki, G. Le Godec, M. Meddahi, C. Mutin, J.A. Osborne, K.D. Papastergiou, A. Pardons, F.M. Velotti, H. Vincke
    CERN, Geneva, Switzerland
  • P. Muggli
    MPI, Muenchen, Germany
 
  The world’s first proton driven plasma wakefield acceleration experiment is presently being studied at CERN. The experiment will use a high energy proton beam extracted from the SPS as driver. Two possible locations for installing the AWAKE facility are considered: the West Area and the CNGS long baseline beam-line. The previous transfer line from the SPS to the West Area was completely dismantled in 2000 and it would need to be fully re-designed and re-built. For this option, geometric constraints for radio protection reasons would limit the maximum proton beam energy to 300 GeV. The existing CNGS line could be used by applying only minor changes to the final part of the lattice for the final focusing and the interface between the proton beam and the laser, required for plasma ionisation and bunch-modulation seeding. The beam line design studies performed for the two options are presented.  
 
TUPEA053 Feasibility Study of the AWAKE Facility at CERN 1253
 
  • E. Gschwendtner, C. Bracco, B. Goddard, M. Meddahi, A. Pardons, E.N. Shaposhnikova, H. Timko, F.M. Velotti, H. Vincke
    CERN, Geneva, Switzerland
 
  Plasma Wakefield acceleration is a rapidly developing field which appears to be a promising candidate technology for future high-energy accelerators. The Proton Driven Plasma Wakefield Acceleration has been proposed as an approach to eventually accelerate an electron beam to the TeV energy range in a single plasma section. To verify this novel technique, a proof-of-principle demonstration experiment, AWAKE, is proposed using 400 GeV proton bunches from the SPS. Detailed studies on the identification of the best site for the installation of the AWAKE facility resulted in proposing the CNGS facility as best location. Design and integration layouts covering the beam line, the experimental area and all interfaces and services will be shown. Among other issues, radiation protection, safety and civil engineering constraints will be raised.  
 
WEPEA053 Progress with the Upgrade of the SPS for the HL-LHC Era 2624
 
  • B. Goddard, T. Argyropoulos, W. Bartmann, H. Bartosik, T. Bohl, F. Caspers, K. Cornelis, H. Damerau, L.N. Drøsdal, L. Ducimetière, J.F. Esteban Müller, R. Garoby, M. Gourber-Pace, W. Höfle, G. Iadarola, L.K. Jensen, V. Kain, R. Losito, M. Meddahi, A. Mereghetti, V. Mertens, Ö. Mete, E. Montesinos, Y. Papaphilippou, G. Rumolo, B. Salvant, E.N. Shaposhnikova, M. Taborelli, H. Timko, F.M. Velotti
    CERN, Geneva, Switzerland
  • E. Gianfelice-Wendt
    Fermilab, Batavia, USA
 
  The demanding beam performance requirements of the HL-LHC project translate into a set of requirements and upgrade paths for the LHC injector complex. In this paper the performance requirements for the SPS and the known limitations are reviewed in the light of the 2012 operational experience. The various SPS upgrades in progress and still under consideration are described, in addition to the machine studies and simulations performed in 2012. The expected machine performance reach is estimated on the basis of the present knowledge, and the remaining decisions that still need to be made concerning upgrade options are detailed.  
 
WEPEA064 SixTrack-Fluka Active Coupling for the Upgrade of the SPS Scrapers 2657
 
  • A. Mereghetti, F. Cerutti, R. De Maria, B. Goddard, V. Kain, M. Meddahi, Ö. Mete, Y. Papaphilippou, D. Pastor Sinuela, V. Vlachoudis
    CERN, Geneva, Switzerland
  • R. Appleby
    UMAN, Manchester, United Kingdom
 
  The LHC Injectors Upgrade (LIU) Project aims at upgrading the systems in the LHC injection chain, to reliably deliver the beams required by the High-Luminosity LHC (HL-LHC). Essential for the clean injection into the LHC, the SPS scrapers are one of the important systems under revision. In order to take into account of the effect of betatron and longitudinal beam dynamics on energy deposition patterns, and nuclear and Coulomb scattering in the absorbing medium onto loss patterns, the SixTrack and Fluka codes have been coupled, profiting from the best of the refined physical models they respectively embed. The coupling envisages an active exchange of tracked particles between the two codes at each turn, and an on-line aperture check in SixTrack, in order to estimate the local cleaning inefficiency of the system. Knob-like, time-dependent strengths have been implemented in SixTrack, since the designed scraper system foresees the use of a magnetic bump. The study is intended to assess the robustness of the proposed scraper as well as its effectiveness with respect to the desired performance.  
 
THPEA040 Design of a Magnetic Bump Tail Scraping System for the CERN SPS 3228
 
  • Ö. Mete, J. Bauche, F. Cerutti, S. Cettour Cave, K. Cornelis, L.N. Drøsdal, F. Galleazzi, B. Goddard, L.K. Jensen, V. Kain, Y. Le Borgne, G. Le Godec, M. Meddahi, E. Veyrunes, H. Vincke, J. Wenninger
    CERN, Geneva, Switzerland
  • A. Mereghetti
    UMAN, Manchester, United Kingdom
 
  The LHC injectors are being upgraded to meet the demanding beam specification required for High Luminosity LHC (HL-LHC) operation. In order to reduce the beam losses which can trigger the sensitive LHC beam loss interlocks during the SPS-to-LHC beam injection process, it is important that the beam tails are properly scraped away in the SPS. The current SPS tail cleaning system relies on a moveable scraper blade, with the positioning of the scraper adjusted over time according to the orbit variations of the SPS. A new robust beam tail cleaning system has been designed which will use a fixed scraper block towards which the beam will be moved by a local magnetic orbit bump. The design proposal is presented, together with the related beam dynamics studies and results from machine studies with beam.  
 
THPEA041 Performance Improvements of the SPS Internal Beam Dump for the HL-LHC Beam 3231
 
  • F.M. Velotti, O. Aberle, C. Bracco, E. Carlier, P. Chiggiato, J.A. Ferreira Somoza, B. Goddard, M. Meddahi, V. Senaj, J.A. Uythoven
    CERN, Geneva, Switzerland
 
  The SPS internal beam dump has been designed for beam specifications well below the HL-LHC ones, and for modes of operation which may not be adequate for the HL-LHC era. The present system suffers from several limitations in the allowed intensity and energy range, and its vacuum performance affects nearby high-voltage kicker systems. In this report the limitations of the internal beam dump system are reviewed, and the possible improvements compared. Preliminary upgrade proposals are presented, taking into consideration the expected operational HL-LHC parameters.  
 
THPWO077 Status and Plans for the Upgrade of the LHC Injectors 3936
 
  • R. Garoby, H. Damerau, S.S. Gilardoni, B. Goddard, K. Hanke, A.M. Lombardi, D. Manglunki, M. Meddahi, B. Mikulec, L. Ponce, E.N. Shaposhnikova, R. Steerenberg, M. Vretenar
    CERN, Geneva, Switzerland
 
  The plans for preparing the LHC injectors to fulfill the needs of the LHC during the next decade have significantly progressed in 2012. Linac4 construction has passed major steps of pre-series fabrication. Hardware developments and beam studies have allowed refining the baseline actions to implement and the beam characteristics achievable at injection into the collider for protons as well as for Lead ions. These achievements are described in this paper, together with the updated project planning matched to the new schedule of the LHC.