MOPWA030 Upgrade of the LHC Injection Kicker Magnets 729
 
  • M.J. Barnes, P. Adraktas, V. Baglin, G. Bregliozzi, S. Calatroni, F. Caspers, H.A. Day, L. Ducimetière, M. Garlaschè, V. Gomes Namora, J.M. Jimenez, N. Magnin, V. Mertens, E. Métral, B. Salvant, M. Taborelli, J.A. Uythoven, W.J.M. Weterings
    CERN, Geneva, Switzerland
 
  The two LHC injection kicker systems, comprising 4 magnets per ring, produce a kick of 1.3 T.m with a rise-time of less than 900 ns and a flattop ripple of less than ±0.5%. A beam screen is placed in the aperture of each magnet, to provide a path for the image current of the high intensity LHC beam and screen the ferrite yoke against wake fields. The screen consists of a ceramic tube with conductors in the inner wall. The initially implemented beam screen ensured a low rate of electrical breakdowns while providing an adequate beam coupling impedance. Operation with increasingly higher intensity beams, stable for many hours at a time, now results in substantial heating of the ferrite yoke, sometimes requiring cool down over several hours before the LHC can be refilled. During the long shutdown in 2013/2014 all 8 kicker magnets will be upgraded with an improved beam screen and an increased emissivity of the vacuum tank. In addition equipment adjacent to the injection kickers and various vacuum components will also be modified to help reduce the vacuum pressure in the kickers during high-intensity operation. This paper discusses the upgrades as well as their preparation and planning.