Author: Maggipinto, M.A.
Paper Title Page
THPEA063 NSLS II Injector Integrated Testing 3285
 
  • G.M. Wang, B. Bacha, A. Blednykh, E.B. Blum, W.X. Cheng, J. Choi, L.R. Dalesio, M.A. Davidsaver, J.H. De Long, R.P. Fliller, W. Guo, K. Ha, H.-C. Hseuh, Y. Hu, W. Louie, M.A. Maggipinto, D. Padrazo, T.V. Shaftan, G. Shen, O. Singh, Y. Tian, K. Vetter, F.J. Willeke, H. Xu, L. Yang, X. Yang
    BNL, Upton, Long Island, New York, USA
  • P.B. Cheblakov, A.A. Derbenev, A.I. Erokhin, S.M. Gurov, R.A. Kadyrov, S.E. Karnaev, E.A. Simonov, S.V. Sinyatkin, V. Smalyuk
    BINP SB RAS, Novosibirsk, Russia
 
  The NSLS-II is a state of the art 3 GeV syn­chro­tron light source under con­struc­tion at Brookhaven Na­tional Lab­o­ra­tory. Since 2012, the in­jec­tor sys­tem grad­u­ally moves to the com­mis­sion­ing stage. It oc­curs after group peo­ple ef­forts on op­tics de­sign, equip­ment spec­i­fi­ca­tions, con­struc­tion and tests, as­sem­bly, in­stal­la­tion and align­ment. It is very im­por­tant and ex­cit­ing. To make the com­mis­sion­ing smooth and ef­fi­cient, an im­por­tant ef­fort was put on the sub-sys­tem in­te­gra­tion test to make sure the de­vice func­tion along with util­ity, tim­ing sys­tem and con­trol sys­tem, to cal­i­brate di­ag­nos­tics sys­tem and to debug high level ap­pli­ca­tion with sim­u­lated beam sig­nals and re­quired hard­ware. In this paper, we re­port our in­te­gra­tion test ex­pe­ri­ence and re­lated con­trol sys­tem soft­ware de­vel­op­ment.