Author: Gabor, C.
Paper Title Page
MOPWA049 Status Report of the FETS Photo Detachment Emittance Instrument at RAL 783
 
  • C. Gabor
    STFC/RAL/ASTeC, Chilton, Didcot, Oxon, United Kingdom
  • G.E. Boorman, A. Bosco, S.M. Gibson
    Royal Holloway, University of London, Surrey, United Kingdom
  • G.E. Boorman, A. Bosco, S.M. Gibson
    JAI, Egham, Surrey, United Kingdom
  • A.P. Letchford
    STFC/RAL/ISIS, Chilton, Didcot, Oxon, United Kingdom
  • P. Savage
    Imperial College of Science and Technology, Department of Physics, London, United Kingdom
  • V.E. Scarpine
    Fermilab, Batavia, USA
 
  The Front End Test Stand at the Ruther­ford Ap­ple­ton Lab­o­ra­tory (RAL) is being de­vel­oped to demon­strate a chopped H beam of 60 mA at 3 MeV with 10% duty cycle. Due to the high beam power it is ad­vis­able to use the tech­nique of photo de­tach­ment to avoid in­tru­sive meth­ods. It is in­tended to apply this tech­nique to per­form emit­tance mea­sure­ments at the out­put of the RFQ at full power. This re­quires a ded­i­cated di­ag­nos­tics di­pole with a spe­cial-made vac­uum cham­ber giv­ing room for the dif­fer­ent beam paths nec­es­sary to in­stall a par­ti­cle de­tec­tor to mea­sure the pro­duced neu­trals. Other as­pects are the beam trans­port and in­flu­ence of the di­pole and its fringe field to the beam trans­port Other con­sid­er­a­tions are the in­stal­la­tion of the laser, the op­tics and the par­ti­cle de­tec­tor it­self.  
 
THPWO086 Status of the RAL Front End Test Stand 3963
 
  • A.P. Letchford, M.A. Clarke-Gayther, D.C. Faircloth, S.R. Lawrie
    STFC/RAL/ISIS, Chilton, Didcot, Oxon, United Kingdom
  • S.M.H. Alsari, M. Aslaninejad, J.K. Pozimski, P. Savage
    Imperial College of Science and Technology, Department of Physics, London, United Kingdom
  • J.J. Back
    University of Warwick, Coventry, United Kingdom
  • G.E. Boorman, A. Bosco, S.M. Gibson
    Royal Holloway, University of London, Surrey, United Kingdom
  • R.T.P. D'Arcy, S. Jolly
    UCL, London, United Kingdom
  • C. Gabor, D.C. Plostinar
    STFC/RAL/ASTeC, Chilton, Didcot, Oxon, United Kingdom
  • J.K. Pozimski
    STFC/RAL, Chilton, Didcot, Oxon, United Kingdom
 
  The Front End Test Stand (FETS) under con­struc­tion at RAL is a demon­stra­tor for the front end sys­tems of a fu­ture high power pro­ton linac. Pos­si­ble ap­pli­ca­tions in­clude a linac up­grade for the ISIS spal­la­tion neu­tron source, new fu­ture neu­tron sources, ac­cel­er­a­tor dri­ven sub-crit­i­cal sys­tems, a neu­trino fac­tory etc. De­signed to de­liver a 60mA H-mi­nus beam at 3MeV with a 10% duty fac­tor, FETS con­sists of a high bright­ness ion source, mag­netic low en­ergy beam trans­port (LEBT), 4-vane 324MHz radio fre­quency quadru­pole, medium en­ergy beam trans­port (MEBT) con­tain­ing a high speed beam chop­per and non-de­struc­tive photo-de­tach­ment di­ag­nos­tics. This paper de­scribes the cur­rent sta­tus of the pro­ject and fu­ture plans.