THPWA035 Intervention Management from Operation to Shutdown 3705
 
  • C. Garino, B. Daudin, J. De Jonghe, A. Dorsival, F. B. Dos Santos Pedrosa, G. Dumont, K. Foraz, E.R.F. Reguero Fuentes
    CERN, Geneva, Switzerland
 
  The In­ter­ven­tion Man­age­ment Plan­ning and Co­or­di­na­tion Tool (IM­PACT) is now widely used in all the ac­cel­er­a­tor com­plex and be­yond. This unique repos­i­tory im­proves the avail­abil­ity of the in­ter­ven­tion in­for­ma­tion for all fa­cil­i­ties, and en­hances its trace­abil­ity. It sup­ports a stan­dard­ized ap­proval work­flow and di­rect link to the ac­cess sys­tem for im­proved con­trol and pro­duc­tiv­ity. IM­PACT cur­rently has 1418 ac­tive users who have de­fined 6880 in­ter­ven­tion re­quests in 2012 so far. In 2013, the CERN Ac­cel­er­a­tor com­plex will enter a shut­down mode after a long pe­riod of op­er­a­tion. Care­ful prepa­ra­tion and sched­ul­ing of ac­tiv­i­ties is para­mount in order to keep the shut­down as short as pos­si­ble, whilst guar­an­tee­ing safety. Dur­ing ex­e­cu­tion, strict con­trol of ac­cess will be en­forced con­sid­er­ing the ra­di­a­tion lev­els. This paper will sum­ma­rize the main im­prove­ments to IM­PACT in this con­text: work dose plan­ning with re­spect to ALARA prin­ci­ples in­clud­ing in­te­gra­tion with the op­er­a­tional dosime­try sys­tem and au­to­matic gen­er­a­tion of safety doc­u­ments from in­ter­ven­tion data.