Author: Cao, J.
Paper Title Page
MOPFI031 Progress on the Construction of the 100 MeV / 100 kW Electron Linac for the NSC KIPT Neutron Source 351
 
  • Y.L. Chi, J. Cao, P. Chen, B. Deng, C.D. Deng, D.Y. He, X. He, M. Hou, X.C. Kong, Q. Le, X.P. Li, J. Liu, R.L. Liu, W.B. Liu, H.Z. Ma, G. Pei, S. Pei, H. Song, L. Wang, S.H. Wang, X. Wang, Q. Yang, J. Yue, J.B. Zhao, J.X. Zhao, Z.S. Zhou
    IHEP, Beijing, People's Republic of China
  • M.I. Ayzatskiy, I.M. Karnaukhov, V.A. Kushnir, V.V. Mytrochenko, A.Y. Zelinsky
    NSC/KIPT, Kharkov, Ukraine
  • Y. Gohar
    ANL, Argonne, USA
 
  IHEP, China is con­struct­ing a 100 MeV / 100 kW elec­tron linac for NSC KIPT, Ukraine. This linac will be used as the dri­ver of a neu­tron source based on a sub­crit­i­cal as­sem­bly. In 2012, the in­jec­tor part of the linac was pre-in­stalled as a test­ing fa­cil­ity in the ex­per­i­men­tal hall #2 of IHEP. The in­jec­tor beam and key hard­ware test­ing re­sults were sat­is­fy­ing. Re­cently, the in­jec­tor test­ing fa­cil­ity was dis­as­sem­bled and all of the com­po­nents for the whole linac have been shipped to Ukraine from China by ocean ship­ping. The in­stal­la­tion of the whole ma­chine in KIPT will be started in June. The progress on the con­struc­tion are re­ported, in­jec­tor beam and key hard­ware test­ing re­sults are pre­sented.  
 
THPWO040 Progress of Injector-1 and Main Linac of Chinese ADS Proton Accelerator 3854
 
  • Y.L. Chi, J. Cao, J.P. Dai, H. Dong, L. Dong, T.M. Huang, X. Jing, S.P. Li, Z. Li, Z.Q. Li, Z.C. Liu, F. Long, Z. Ma, H.F. Ouyang, W.M. Pan, Q.L. Peng, P. Su, Y.F. Sui, J.Y. Tang, J.L. Wang, Q.B. Wang, Q. Ye, Z.S. Zhou
    IHEP, Beijing, People's Republic of China
 
  China ADS study pro­gram was Sup­ported by the "Strate­gic Pri­or­ity Re­search Pro­gram " of the Chi­nese Acad­emy of Sci­ences at 2011, which aims to de­sign and build an ADS demon­stra­tion fa­cil­ity with the ca­pa­bil­ity of more than 1000 MW ther­mal power in about twenty years. The dri­ver Linac is de­fined to be1.5 GeV in en­ergy, 10mA in cur­rent and in CW op­er­a­tion mode. To meet the ex­tremely high re­li­a­bil­ity and avail­abil­ity of ADS, the Linac is de­signed with much in­stalled mar­gin and fault tol­er­ance. ADS ac­cel­er­a­tor is com­posed of two par­al­lel 10MeV in­jec­tors and a main Linac. The su­per­con­duct­ing ac­cel­er­a­tion struc­tures are em­ployed ex­cept the RFQs. This paper will pre­sent de­sign of the China ADS ac­cel­er­a­tor and re­lated key tech­nol­ogy de­vel­op­ments.