Paper | Title | Page |
---|---|---|
MOPO022 | Precision Beam Instrumentation and Feedback-Based Beam Control at RHIC | 526 |
|
||
Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy. In this report we present advances in beam instrumentation required for feedback-based beam control at the Relativistic Heavy Ion Collider (RHIC). Improved resolution has contributed to enabling now routine acceleration with multiple feedback loops. Better measurement and control of the beam’s properties have allowed acceleration at a new working point and have facilitated challenging experimental studies. |
||
TUYA03 | Stochastic Cooling of a High Energy Collider | 913 |
|
||
Three dimensional stochastic cooling was successfully implemented at the Relativistic Heavy Ion Collider to overcome emittance growth from intra-beam scattering. The talk reports on the experience of operating a collider with continuous cooling. The application of such techniques to other hadron machine (e.g. LHC) will be discussed. | ||
![]() |
Slides TUYA03 [1.350 MB] | |
TUPZ038 | RHIC Performance for FY2011 Au+Au Heavy Ion Run | 1894 |
|
||
Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy. Following the Fiscal Year (FY) 2010 (Run-10) Relativistic Heavy Ion Collider (RHIC) Au+Au run [1], RHIC experiment upgrades sought to improve detector capabilities. In turn, accelerator improvements were made to improve the luminosity available to the experiments for this run (Run-11). These improvements included: a redesign of the stochastic cooling systems for improved reliability; a relocation of “common” RF cavities to alleviate intensity limits due to beam loading; and an improved usage of feedback systems to control orbit, tune and coupling during energy ramps as well as while colliding at top energy. We present an overview of changes to the Collider and review the performance of the collider with respect to instantaneous and integrated luminosity goals. |
||