Author: Byford, D.F.
Paper Title Page
MOPC064 Upgrade and Commissioning of the 88-Inch Cyclotron Final Power Amplifier 229
 
  • M. Kireeff Covo, D.F. Byford, P.W. Casey, A. Hodgkinson, S. Kwiatkowski, C.M. Lyneis, L. Phair, A. Ratti, C.P. Reiter
    LBNL, Berkeley, California, USA
 
  Funding: This work was supported by the Director, Office of Science, Office of High Energy and Nuclear Physics, Division of Nuclear Physics, U.S. Department of Energy under Contract DE-AC02-05CH11231.
The RF sys­tem of the 88-Inch Cy­clotron at Lawrence Berke­ley Na­tion­al Lab­o­ra­to­ry is a res­o­nant sys­tem based on the quar­ter-wave can­tilever type res­onat­ing struc­ture. Power is fed to the Dee from the anode of the 500 kW RCA 6949 tetrode tube op­er­at­ing in ground­ed cath­ode con­fig­u­ra­tion, which is ca­pac­i­tive­ly cou­pled to the side of the Dee stem. The tube is ob­so­lete and makes its con­tin­ued use im­prac­ti­cal. A new final power am­pli­fi­er was de­signed and built using the com­mer­cial­ly avail­able tube Eimac 4W150,000E. The new am­pli­fi­er was suc­cess­ful­ly com­mis­sioned and has been re­li­able and easy to op­er­ate. An overview of the sys­tem up­grade and de­tails of the com­mis­sion­ing will be pre­sent­ed.