MOPD041 | Recent Progress in the Beam Commissioning of J-PARC Linac | 774 |
|
||
The user operation of J-PARC linac was started in December 2008, and it has been operated with the limited beam power of less than 1.2 kW making efforts at improving hardware availability. Since November 2007, the beam power from the linac has been increased to 7.2 kW that corresponds to 120 kW from the downstream 3-GeV synchrotron. We also performed a high-power demonstration run with 18 kW (or 300 kW from the synchrotron) that corresponds to the design beam power for the present configuration. In the course of the beam power ramp-up, we have suffered from significant beam losses in the beam transport line after the linac. Accordingly, the emphasis of the beam tuning has been shifted to the mitigation of the uncontrolled beam losses. Some of the loss mechanisms are identified in the beam studies, and we have succeeded in mitigating them. In this paper, we present recent progress in the beam commissioning of J-PARC linac with emphasis on the effort to mitigate the beam losses. |
||
THPEB015 | Beam Injection Tuning of the J-PARC Main Ring | 3915 |
|
||
The beam commissioning of J-PARC (Japan Proton Accelerator Research Complex) MR (Main Ring) was started from May 2008 and is in progress. As usual, injection tuning is in the first stage and strongly related to other tuning items. Starting with design schemes, making adjustment due to leakage field influence from injection septum, doing envelope matching considering dilution of beam profile in Main Ring are reported in this paper. The 'Without bump' scheme was got on June 15th 2008, while 'With bump' scheme on February 15th 2009. Beam orbit betatron oscillation to the MR close orbit which cause by injection error is less than 1 mm both in horizontal and vertical direction. Meanwhile, Beam Optics matching for 3 GeV beam from 350BT to MR has been well done too, which is also very important. * T. Koseki, Challenges and Solutions for J-PARC Commissioning and Early Operation, in these proceedings |
||
THPEB016 | Beam Fast Extraction Tuning of the J-PARC Main Ring | 3918 |
|
||
The beam commissioning of J-PARC/MR has been started from May 2008 and is in progress*. One key purpose of MR commissioning is the 30 GeV beam fast extraction to Neutrino beam line, which reflect the overall commissioning result. In the MR, the third straight section is assigned for the fast extraction. 5 kickers and 8 septa were installed there, which can give beam a bipolar kick to inside or outside of MR. Inside kick means beam to Neutrino Oscillation Experiment, while outside kick means beam dumped to abort line. However before commissioning, the measured magnetic field distribution of each septa shows non-linear profile along the horizontal direction. In order to find the influence, a simulation with these measured field has been performed. Depends on this study and some OPI (Operation Interface) made by code SAD for orbit modification online, fast extraction of 30 GeV beam to Neutrino line has been achieved on April 23rd 2009. Beam orbit have been tuned to less than 0.5 mm and 0.1 mrad in both horizontal and vertical at the beginning of Neutrino line, which is also the end of MR fast extraction. And so far, 100 kW continual operation to neutrino line have been achieved, too. * T. Koseki, "Challenges and Solutions for J-PARC Commissioning and Early Operation", in these proceedings |