Paper | Title | Page |
---|---|---|
TUPEB020 | Beam Dynamic Issues in the BEPCII Luminosity Commissioning | 1560 |
|
||
As a tau-charm factory like collider, the upgrade project of the Beijing Electron Positron Collider (BEPCII), has reached its first design value of luminosity. During the commissioning of its luminosity, beam optics recovery, machine parameters measurement, detector solenoid compensation, and instability cure are main problems we met. Besides commissioning the machine, beams were delivered to the users from high energy physics and synchrotron radiation. This paper summarizes the accelerator physics issues in the BEPCII luminosity commissioning. Supported by National Natural Sciences Foundation of China (10725525) |
||
MOPE028 | Analysis and Calculation of Beam Energy Spread Monitor for HLS LINAC | 1029 |
|
||
The energy spread measurement by use the energy spectrum analysis system at HLS LINAC now is an intercepting measurement which can't measure the real injection beam. To achieve the non-intercepting measurement, a new Beam position monitor (BPM) with eight stripline electrodes in four-axis symmetry is designed, which can measure the energy spread at HLS LINAC in real time. This paper has introduced the physical structure of this new BPM which include eight 20 degree opening angle, 1/4 wavelength (26.2mm) length Stripline electrodes in detail, analyzed and calculated the electrode response and picking up the quadrupole component, and got the theoretical sensitivities of different methods. The BPM is simulated and calculated by CST Microwave Studio Program. The results shows the parameters such as characteristic impedance, electrode coupling degree, time-domain response and frequency-domain response etc are all meet the requirement of HLS LINAC and transfer line. |
||
MOPE032 | Application of the Gige Vision Digital Camera for Beam Diagnostics in HLS | 1041 |
|
||
GigE Vision (Gigabit Ethernet vision standard) is a new interface standard for the latest vision of cameras with higher performance compared to analogue vision standard and other digital vision standard. In recent years, the market of industrial vision components is evolving towards GigE Vision. This paper presents applications of digital camera comply with GigE Vision standard for the measurement of beam profile and emittance at the storage ring of HLS (Hefei Light Source). These cameras provide low distortion for image transmission over long distance with high image rate. Using the image of beam profile transmitted by GigE Vision digital camera, we calculated the horizontal and vertical center positions, and then we calibrated these center positions by BPM (Beam Position Monitor) system. According to the result of calibration and the pixel size of CCD sensor, transverse sizes of beam profile were calculated, further more the transverse emittance and coupling factor were calculated as well. |