A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Wang, J.Q.

Paper Title Page
TUPEB020 Beam Dynamic Issues in the BEPCII Luminosity Commissioning 1560
 
  • Q. Qin, N. Huang, D. Ji, Y. Jiao, Y.D. Liu, Y.M. Peng, D. Wang, J.Q. Wang, N. Wang, X.H. Wang, Y. Wei, X.M. Wen, J. Xing, G. Xu, C.H. Yu, C. Zhang, Y. Zhang
    IHEP Beijing, Beijing
  • Z. Duan
    IHEP Beiing, Beijing
 
 

As a tau-charm factory like collider, the upgrade project of the Beijing Electron Positron Collider (BEPCII), has reached its first design value of luminosity. During the commissioning of its luminosity, beam optics recovery, machine parameters measurement, detector solenoid compensation, and instability cure are main problems we met. Besides commissioning the machine, beams were delivered to the users from high energy physics and synchrotron radiation. This paper summarizes the accelerator physics issues in the BEPCII luminosity commissioning.


Supported by National Natural Sciences Foundation of China (10725525)

 
WEXMH01 Status and Performance of BEPCII 2359
 
  • Q. Qin, L. Ma, J.Q. Wang, C. Zhang
    IHEP Beijing, Beijing
 
 

BEPCII is the upgrade project of the Beijing Electron Positron Collider (BEPC) with its design luminosity of 1x1033cm-2s-1 @1.89 GeV. The construction of BEPCII was completed in May 2008. The collider has been operated for high energy physics experiments since February 2009 with 1/5 of design luminosity at psi(3680). The luminosity has been steadily increased during the operation. Status and updated performance of BEPCII will be reported.

 

slides icon

Slides