A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Ueno, T.

Paper Title Page
WEPD085 Design of the Pulse Bending Magnet for Switching the Painting Area Between the MLF and MR in J-Parc 3-Gev Rcs 3293
 
  • T. Takayanagi, M. Kinsho, P.K. Saha, T. Togashi, T. Ueno, M. Watanabe, Y. Yamazaki, M. Yoshimoto
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken
  • H. Fujimori
    J-PARC, KEK & JAEA, Ibaraki-ken
  • Y. Irie
    KEK, Ibaraki
 
 

At the J-PARC 3-GeV injection, the injection painting area is designed to be different for supplying the MLF (Material Life Science Facility) and MR (50GeV Main Ring) beams. Along with the injection system in the ring, pulsed switching magnets which are installed in the injection beam-line should also have a function to control the beam orbit at 25Hz. The deflection angle ranges from 3 to 38 mrad to meet the user operation as well as the beam physics run.

 
WEPD086 Operation of Kicker System using Thyratron of the 3 GeV Rapid Cycling Synchrotron of J-PARC 3296
 
  • M. Watanabe, J. Kamiya, K. Suganuma, T. Takayanagi, N. Tani, T. Togashi, T. Ueno, Y. Watanabe
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken
 
 

3 GeV rapid cycling synchrotron (RCS) of J-PARC accelerates proton beams from the 181 MeV up to 3 GeV. The RCS injects the beam to the Main Ring and transports it to the muon production target and neutron production target in the Materials and Life Science Experimental Hall. Proton beams in the RCS are fast extracted by kicker magnets at the repetition rate of 25 Hz. The rise time of the magnetic field is approximately 260 ns due to the propagation time through the coaxial cable and the kicker magnet itself. The flat-top length of it is required to 840 ns in order to extract two beam bunches. Pulse forming lines (PFL) and thyratrons are used to make the rise time and the flat-top, at the maximum charging voltage of 80 kV. Two thyratrons, which is a CX1193C made by e2V Ltd., are used for a power supply. 16 thyratrons are used in the eight power supplies of the kicker system. Since thyratrons are gaseous discharge switching devices, they often make misfire or self-breakdown in several hours. In this paper, present status of operation and voltage adjustment method of the reservoir and cathode heater power supply of the thyratrons in the kicker system are described.