MOPEC066 | Status of Mass Production of the ACS Cavity for the J-PARC Linac Energy Upgrade | 618 |
|
||
The mass production of the ACS (Annular Coupled Structure) cavity started from March 2009 for the J-PARC Linac energy upgrade from 181 MeV to 400 MeV. This upgrade project requires 18 ACS accelerating modules and two debunchers additionally within three years. The construction schedule is so tight that we have to optimize the fabrication process. For example the geometrical beta is varied for each accelerating module, thus the several test cells were fabricated and for the all beta before the mass production to confirm the initial design and the frequency tuning procedure. This paper describes our approach for the mass production and the current status and results. |
||
TUPEA046 | LLRF Controller Upgrade for the J-PARC 400 MeV LINAC | 1434 |
|
||
The output energy of the J-PARC LINAC will be upgraded from 181 to 400 MeV in the next two years by adding high-beta acceleration sections. The upgrade of the FPGA-based digital LLRF controller for the 400 MeV LINAC will be presented in this paper. The new LLRF control system works for both the 324 MHz low-beta and 972 MHz high-beta sections. Many functions are added into the LLRF controller, such as 1) working for different RF frequencies, 2) gradually increasing the feedback gains in the feedback loop instead of fixed ones, 3) automatic chopped-beam compensation, 4) automatically switching the beam loading compensation in accordance with the different beam operation mode, 5) input rf-frequency tuning carried out by a FPGA to match the rf cavities during the rf start-up, 6) auto-tuning of the rf cavity tuner by detecting the phase curve of the rf cavity during the field decay instead of the phase difference between the cavity input and output signals. |