Paper | Title | Page |
---|---|---|
MOPD080 | Upgrade of the Booster Beam Position Monitors at the Australian Synchrotron | 882 |
|
||
Thirty two Bergoz Beam Position Monitors are located in the Australian Synchrotron booster ring. They currently suffer from a poor signal-to-noise ratio and a low sample rate data acquisition (DAQ) system, provided by a portable DAQ device. This architecture is being upgraded to offer better performance. Phase matched low attenuation cables are being pulled and readout electronics will be located in two sites to reduce cable length. Data acquisition will be upgraded using a high accuracy PCI DAQ board. The board's trigger, originally delivered by a Delay Generator, will be generated by an Event Receiver output following our recent upgrade of the timing system. The new Linux driver will be EPICS-based, for consistency with our control system. |
||
TUPD026 | Impedance Effects in the Australian Synchrotron Storage Ring | 1979 |
|
||
The Australian Synchrotron storage ring must maintain a stable electron beam for user operations. The impedance characteristics of the storage ring can give rise to instabilities that adversely affect the beam quality and need to be well understood. Collective effects driven by the resistive wall impedance are particularly relevant at the Australian synchrotron and their strengths are enhanced by small gap insertion devices, such as IVUs. This study will explore the impedance issues identified in the Australian Synchrotron storage ring and current mitigation techniques. |
||
WEPEA003 | Time Resolved Tune Measurements and Stability Analysis of the Australian Synchrotron Booster | 2472 |
|
||
The Australian Synchrotron booster synchrotron accelerates electrons from 100 MeV to 3 GeV in 600 ms. The fractional tune components that were measured are presented in two graphical formats showing the time-resolved measurement of the horizontal and vertical tunes. This experiment demonstrated that the current in the booster was extremely sensitive to the ratio of BF to BD combined-function magnets. Large variations of the fractional tunes were found to follow the differences in the gradients of the BD and BF combined-function magnet ramping curves and with this knowledge, alterations were made to the ramping table increasing the efficiency of the booster by on average 40%. Rapid fluctuation of the tunes meant that it could not be distinguished during the first 80ms of the ramp. Multiple side bands to the revolution harmonic were visible during a minimal sweep time of 2.5ms, during this first 80ms. |
||
WEPEB027 | Preliminary Operational Experiences of a Bunch-by-bunch Transverse Feedback System at the Australian Synchrotron | 2743 |
|
||
The Australian Synchrotron storage ring has a resistive wall instability in the vertical plane. Presently this instability is being controlled by increasing the vertical chromaticity. However new in-vacuum insertion devices that significantly increase the ring impedance may demand chromatic corrections beyond the capabilities of the sextupole magnets. A transverse bunch-by-bunch feedback system has been commissioned to combat the vertical instability* and provide beam diagnostics**. A high frequency narrow band mode that could not be damped was initial encountered with IVUs at minimum gap preventing the system from being implemented during user beam. Tuning of the bunch fill pattern, the digital filters and mapping out the system response lead to a configuration for user mode operations. * Spencer, M.J. et. al. EPAC'08, Genoa, Italy |