Sueno, T.

Paper Title Page
TUPEB009 Installation of Skew Sextupole Magnets at KEKB 1533
 
  • M. Masuzawa, K. Egawa, T. Kawamoto, Y. Ohsawa, T. Sueno, N. Tokuda
    KEK, Ibaraki
 
 

A new set of magnets, skew sextupole magnets, were designed, manufactured, measured and installed during the winter shutdown of 2009. Twenty magnets were installed in the HER and eight magnets were installed in the LER. It was a challenging job for the magnet group to design, manufacture, measure the magnetic field and install them in the tunnel in just three months. Much effort to finish the installation in time and reduce the production cost was made at every step of the entire process. With these newly installed skew sextupole magnets, a significant luminosity boost was achieved. The production and installation of the skew sextupole magnets are described in this report.

 
WEPD060 Update of Main Magnet Power Supplies at Pf-Ar 3233
 
  • T. Ozaki, A. Akiyama, K. Harada, T. Kasuga, Y. Kobayashi, T. Miyajima, S. Nagahashi, T.T. Nakamura, M. Ono, T. Sueno
    KEK, Ibaraki
 
 

At PF-AR, a bending magnet power supply was updated in 2007. The converter works in the 3 pulsed PWM. A trouble caused by higher harmonics above 40th had occurred. We manufactured filters and installed in 6.6kV ac lines in 2008. Furthermore, a QF magnet power supply was updated in 2009. This paper reports on the update of PF-AR main magnet power supplies.