A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Serpico, C.

Paper Title Page
TUPE015 The X-band System for the FERMI@ELETTRA FEL Project 2173
 
  • G. D'Auria, M.M. El-Ashmawy, A. Rohlev, M. Scafaru, C. Serpico, A. Turchet, D. Wang
    ELETTRA, Basovizza
 
 

The single pass FEL facility FERMI@ELETTRA, in construction at the ELETTRA Synchrotron Radiation Laboratory in Trieste, requires very short electron bunches with a very high beam quality at the entrance of the undulator chain. To linearize the longitudinal phase space before the bunch compression, mitigating the effects of Coherent Synchrotron Radiation (CSR), a 4th harmonic accelerating section (12 GHz) will be installed before the first magnetic chicane. Here an overall description of the X-band system under development is reported.