A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Schömers, C.

Paper Title Page
MOPEA006 Operational Status and Further Enhancements of the HIT Accelerator Facility 73
 
  • A. Peters, R. Cee, E. Feldmeier, M. Galonska, Th. Haberer, K. Höppner, M.B. Ripert, S. Scheloske, C. Schömers, T. Winkelmann
    HIT, Heidelberg
 
 

Since November, 15th 2009 patients are treated with protons and carbon ions at the Heidelberg Ionbeam Therapy Centre (HIT). The facility - two ion sources, an injector linac and a compact synchrotron - is operated in 24/7-mode with high availability. The HIT beam time schedule is discussed along the statistics automatically generated by the control system. Besides the patient treatment in the first horizontal room beam time is also used to develop enhanced treatment software in the second horizontal room as well as for commissioning the gantry place. Additionally, biophysics studies are served at a separate experimental place. In parallel, an upgrade program for the accelerator is under way: at first a test bench for a third ion source, later on dedicated to He beams, will be used to study several ideas to increase the injector performance. Furthermore operation mechanisms are under progress to control directly the synchrotron dipole and quadrupole fields as well as to regulate the spill structure - the aim of both developments is to form a uniform and extremely stable extracted beam with high duty cycle. An overview on this entire accelerator R&D at HIT will be given.

 
MOPD004 Magnetic Field Correction in Normal Conducting Synchrotrons 675
 
  • E. Feldmeier, Th. Haberer, A. Peters, C. Schömers, R. Steiner
    HIT, Heidelberg
 
 

While ramping the magnets in a synchrotron the magnetic fields deviate from their set values. Especially the field errors in dipole and quadrupole magnets result in different problems during operation. At the Heidelberg Ion Therapy Center HIT a measuring system with extremely high precision has been developed. It can measure in real time integral magnetic fields with a precision of better than 5*10-5 in a reproducible way. A feed-back control system for the magnetic fields is being installed and will be operational in May 2010. This control loop lets the magnets reach the nominal field much faster and thus shortens the dead time in a synchrotron cycle. The cycle can be reduced by 30% and more patients can be treated.