A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Scheidt, K.B.

Paper Title Page
TUPEC032 Injection Efficiency Monitoring with Libera Brilliance Single Pass 1790
 
  • M. Znidarcic
    I-Tech, Solkan
  • K.B. Scheidt
    ESRF, Grenoble
 
 

Initially, the Libera Brilliance Single Pass was intended for beam position monitoring at injector system for the FEL machines, this was afterwards followed by the idea of using it on transfer lines on the 3rd generation light sources. The device can be used on pickup buttons and on striplines. The measurement principles and results of Libera Brilliance Single Pass at ESRF, as beam-charge monitor and injection-efficiency monitor, are presented.

 
WEPEA013 Operation and Upgrade of the ESRF Synchrotron Light Source. 2502
 
  • J.-L. Revol, J.C. Biasci, J-F. B. Bouteille, J. Chavanne, P. Elleaume, F. Ewald, L. Farvacque, F. Franchi, G. Gautier, L. Goirand, M. Hahn, L. Hardy, J. Jacob, J.M. Koch, M.L. Langlois, G. Lebec, J.M. Mercier, T.P. Perron, E. Plouviez, K.B. Scheidt, V. Serrière
    ESRF, Grenoble
 
 

After 15 years of highly successful user operation, the Council of the ESRF are funding an ambitious 7 year upgrade programme (2009-2015) of the European Synchrotron Radiation Facility. In this context the accelerator complex will benefit from a number of upgrades. Several insertion device straight sections will be lengthened from five to six meters. The beamline scientific capacities will be increased by operating some straight sections in the canting geometry. New insertion devices will be built to fulfill the requirements of the scientific programme. The RF system also faces a major reconstruction with the replacement of some klystron based transmitters by high power solid state amplifiers and the development of HOM damped cavities operating at room temperature. The orbit stabilisation system system will be renovated. This paper reports on the present operation performances of the source, highlighting the recent development, as well as the advancement of the upgrade projects.