A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Satou, K.

Paper Title Page
THPEB015 Beam Injection Tuning of the J-PARC Main Ring 3915
 
  • G.H. Wei
    KEK/JAEA, Ibaraki-Ken
  • A. Ando, Y. Hashimoto, T. Koseki, J. Takano
    J-PARC, KEK & JAEA, Ibaraki-ken
  • S. Igarashi, K. Ishii, M. Tomizawa, M. Uota
    KEK, Ibaraki
  • P.K. Saha, K. Satou, M.J. Shirakata
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken
 
 

The beam commissioning of J-PARC (Japan Proton Accelerator Research Complex) MR (Main Ring) was started from May 2008 and is in progress. As usual, injection tuning is in the first stage and strongly related to other tuning items. Starting with design schemes, making adjustment due to leakage field influence from injection septum, doing envelope matching considering dilution of beam profile in Main Ring are reported in this paper. The 'Without bump' scheme was got on June 15th 2008, while 'With bump' scheme on February 15th 2009. Beam orbit betatron oscillation to the MR close orbit which cause by injection error is less than 1 mm both in horizontal and vertical direction. Meanwhile, Beam Optics matching for 3 GeV beam from 350BT to MR has been well done too, which is also very important.


* T. Koseki, Challenges and Solutions for J-PARC Commissioning and Early Operation, in these proceedings

 
MOPE011 Shot-by-shot Beam Position Monitor System for Beam Transport Line from RCS to MR in J-PARC 978
 
  • M. Tejima, D.A. Arakawa, Y. Hashimoto
    KEK, Ibaraki
  • K. Hanamura
    MELCO SC, Tsukuba
  • N. Hayashi
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken
  • K. Satou, T. Toyama, N. Yamamoto
    J-PARC, KEK & JAEA, Ibaraki-ken
 
 

To maintain the beam orbit of beam transport line from RCS to MR in J-PARC (3-50BT), 14 beam position monitors (BPMs) were installed. Their signals gathered in the local control building (D01) have been measured by using 14 digitizing oscilloscopes. The data acquisition system have a performance of shot-by-shot measurement.

 
MOPE015 Application of a Single-Wire Proportional Counter to the Beam Loss Monitoring at J-PARC MR 990
 
  • K. Satou, T. Toyama
    J-PARC, KEK & JAEA, Ibaraki-ken
  • H. Harada, K. Yamamoto
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken
 
 

A single-wire proportional counter which has the maximum gain of 6·104 is used as a beam loss monitor (p-BLM), thus low-level beam loss can be monitored. However, it involves gain reduction problem by the space charge effect. It is essential to estimate the space charge effect to utilize a proportional counter for beam loss monitoring. The calibration procedure is discussed for the p-BLMs for 3-50BT and MR. Measurements of residual dose were made and some nuclei were identified. Radiation from the short-life nucleus, Fe53 (T1/2=8.51m), may be a good index to predict a residual dose after a long term beam operation.

 
WEPEB007 The Data Acquisition System of Beam Position Monitors in J-PARC Main Ring 2698
 
  • S. Hatakeyama, N. Hayashi
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken
  • D.A. Arakawa, Y. Hashimoto, S. Hiramatsu, J.-I. Odagiri, M. Tejima, M. Tobiyama, T. Toyama, N. Yamamoto
    KEK, Ibaraki
  • K. Hanamura
    MELCO SC, Tsukuba
  • K. Satou
    J-PARC, KEK & JAEA, Ibaraki-ken
 
 

The Data Acquisition System of Beam Position Monitors(BPMs) in J-PARC Main Ring are consist of 186 Linux-based Data Processing Cirquits(BPMCs) and 12 EPICS IOCs. They are important tool to see the COD and turn-by-turn beam positions. This report describes the process of the data reconstruction which include how the various calibration constants are applied.

 
MOPE012 Performance of the Main Ring BPM during the Beam Commissioning at J-PARC 981
 
  • T. Toyama, D.A. Arakawa, S. Hiramatsu, S. Igarashi, S. Lee, H. Matsumoto, J.-I. Odagiri, M. Okada, M. Tejima, M. Tobiyama
    KEK, Ibaraki
  • K. Hanamura, S. Hatakeyama
    MELCO SC, Tsukuba
  • Y. Hashimoto, K. Satou, J. Takano
    J-PARC, KEK & JAEA, Ibaraki-ken
  • N. Hayashi
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken
 
 

Experiences of operating BPM's during beam commissioning at the J-PARC MR are reported. The subjects are: (1) bug report, statistics and especially the effect of a beam duct step, (2) position resolution estimation (<30 micrometers with 1 sec averaging), (3) beam based alignment.