A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Saeki, R.

Paper Title Page
THPEB020 Beam Study Results with HBC Stripping Foils at the 3-GeV RCS in J-PARC 3927
 
  • M. Yoshimoto, H. Harada, N. Hayashi, H. Hotchi, Y. Irie, M. Kawase, M. Kinsho, R. Saeki, P.K. Saha, K. Yamamoto, Y. Yamazaki
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken
  • T. Ishiyama
    KEK/JAEA, Ibaraki-Ken
  • I. Sugai
    KEK, Ibaraki
 
 

The hybrid type thick boron-doped carbon (HBC) stripping foils are installed and used for the beam injection at the 3GeV RCS (Rapid Cycling Synchrotron) in J-PARC (Japan Proton Accelerator Research Complex). The HBC foils are developed by Sugai group in KEK, which improved the lifetime drastically. Up to now, the performance deterioration of the stripping foils can not be seen after the long beam irradiation for the 120kW user operation and 300kW high power beam demonstration at the RCS. In order to examine the characteristic of the HBC foils, various beam studies were carried out. The beam-irradiated spot at the foil was measured by scanning the foil setting position, the charge exchange efficiency was evaluated with various thickness foils, and the effect of the SiC fibers supporting the foil mounting was checked with different mounting foils. Beam study results obtained with using the HBC foils will be presented. In addition, the trends of outgas from the stripping foils and the deformations of the foils during the beam irradiation will be reported.

 
WEPEB065 Beam Loss of J-PARC Rapid Cycling Synchrotron at Several Hundred kW Operation 2842
 
  • K. Yamamoto, H. Harada, S. Hatakeyama, N. Hayashi, H. Hotchi, P.K. Saha, M. Yoshimoto
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken
  • R. Saeki
    KEK/JAEA, Ibaraki-Ken
 
 

A 3GeV Rapid-Cycling Synchrotron (RCS) in Japan Proton Accelerator Research Complex (J-PARC) has continuously provided more than 100kW proton beam to the Neutron target since October 2009. And we also successfully accelerated 300kW beam for one hour on December 10th by way of trial. We found some problems through these experiences. We report those problems and the residual dose in such high intensity operation.