A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Pont, M.

Paper Title Page
WEPD066 Power Converters for ALBA Storage Ring 3251
 
  • M. Pont, D. Alloza, R. Petrocelli, D. Yepez
    CELLS-ALBA Synchrotron, Cerdanyola del Vallès
  • R. Camell, G. Gross, M. Teixido
    CITCEA-UPC, Barcelona
 
 

ALBA is a 3 GeV third generation synchrotron light source under construction in Spain. The design and performance of the ALBA Storage Ring Power Converters will be described. A total of 122 power converters are required: 1 for the dipoles (all connected in series), 112 for the quadrupoles (each magnets with its own power supply) and 9 for the sextupoles (each family connected in series). All converters are switched mode with full digital regulation and a common control interface. The paper will describe the performance of the power converters and compare it with the design specifications.

 
WEPD067 Power Converters for ALBA Booster 3254
 
  • M. Pont, D. Alloza, R. Petrocelli, D. Yepez
    CELLS-ALBA Synchrotron, Cerdanyola del Vallès
  • R. Camell, G. Gross, M. Teixido
    CITCEA-UPC, Barcelona
 
 

ALBA is a 3 GeV third generation synchrotron light source under construction in Spain. The injection system is composed of a 100 MeV Linac as pre-injector followed by a full energy booster synchrotron. The booster requires AC power converters operating at 3.125 Hz with a sinusoidal current waveform. All converters are switched mode with full digital regulation and a common control interface. The design specifications have been demonstrated and early tests on the Booster commissioning with beam will be presented

 
WEPD069 Booster of the ALBA Synchrotron Light Source: Pre-commissioning experiences 3257
 
  • M. Pont
    CELLS-ALBA Synchrotron, Cerdanyola del Vallès
 
 

ALBA is a 3 GeV third generation synchrotron light source under construction in Spain. The injection system is composed of a 100 MeV Linac as pre-injector followed by a full energy booster synchrotron which shares the same tunnel as the storage ring. With a circumference of 249.6 m and a magnetic lattice based on combined magnets an emittance of 9 nm.rad has been predicted. At present time we are in an intensive sub-system commissioning testing with the aim to start the commissioning with beam early in January 2010.